4002 Sage Point MP ImprovementsRESOLUTION NO. 4002
A RESOLUTION ACCEPTING STREET AND UTILITY IMPROVEMENTS FOR
MUNICIPAL USE AS A PART OF THE SAGE POINT MAJOR PLAT DEVELOPMENT
Recitals:
1. Street and Utility improvements lying in dedicated right-of-way or easements are in
place and connected to the City of Moses Lake’s street and utility systems as part of
Sage Point Major Plat Development. The project includes full-width street, water,
sewer, and storm improvements to Dorsing Street.
2. Said street and utility improvements have been installed in accordance with the City of
Moses Lake’s Community Standards and were completed in January of 2025.
3. RCW 35.90.030, indicates that developer installed public street and utility facilities,
should be accepted by the City of Moses Lake upon completion if the facilities are
built to city standards.
4. A Subdivision Maintenance Bond shall be provided by the developer for a two-year
maintenance period which commences on January 28, 2025.
Resolved:
1. The City Council of the City of Moses Lake accepts the Sage Point Major Plat
Development street and utility improvements as facilities of the City of Moses Lake
and as such will charge for use of facilities as authorized by ordinance.
2. After January 28, 2025, all operational costs of the said street and utility
improvements shall be borne by the City of Moses Lake as provided by city
ordinance and subject to the required maintenance bond.
3. Subject to final inspection, after January 29, 2027, all further maintenance and
operational costs of said street and utility improvements shall be borne by the City of
Moses Lake, as provided by city ordinance.
ACCEPTED by the City Council on January 28, 2025
_______________________________
Dustin Swartz, Mayor
ATTEST:
_______________________________
Debbie Burke, City Clerk
Document Ref: FPITM-AQS2A-4VBYR-TFZFE Page 1 of 1
Signature Certificate
Reference number: FPITM-AQS2A-4VBYR-TFZFE
Document completed by all parties on:
31 Jan 2025 19:45:06 UTC
Page 1 of 1
Signer Timestamp Signature
Mayor Dustin Swartz
Email: dswartz@cityofml.com
Recipient Verification:
Sent:29 Jan 2025 20:20:17 UTC
Viewed:29 Jan 2025 20:42:19 UTC
Signed:29 Jan 2025 20:43:10 UTC
✔Email verified 29 Jan 2025 20:42:19 UTC
IP address: 74.82.240.250
Location: Moses Lake, United States
Debbie Burke
Email: dburke@cityofml.com
Recipient Verification:
Sent:29 Jan 2025 20:20:17 UTC
Viewed:29 Jan 2025 20:21:17 UTC
Signed:31 Jan 2025 19:45:06 UTC
✔Email verified 29 Jan 2025 20:21:17 UTC
IP address: 63.135.54.162
Location: Moses Lake, United States
Signed with PandaDoc
PandaDoc is a document workflow and certified eSignature
solution trusted by 50,000+ companies worldwide.