4021 Barrington Point 5 Phase 2 ImprovementsRESOLUTION NO. 4021
A RESOLUTION ACCEPTING STREET AND UTILITY IMPROVEMENTS FOR
MUNICIPAL USE AS A PART OF THE BARRINGTON POINT 5 PHASE 2 MP
Recitals:
1. Street and Utility improvements lying in dedicated right-of-way or easements are in
place and connected to the City of Moses Lake’s street and utility systems as part of
Barrington Point 5 Phase 2 MP. The project includes full width street, water, sewer,
and storm improvements to Saratoga Way, Montclair Street, and Rambler Street,
1,340’ of 8” C-900 water main, two hydrant assemblies, 266’ of 8” PVC gravity sewer
main, 126’ of 8” PVC storm sewer main, five catch basins, and three drywells.
2. Said street and utility improvements have been installed in accordance with the City of
Moses Lake’s Community Standards and were completed in July of 2025.
3. RCW 35.91.030, indicates that developer installed public street and utility facilities,
should be accepted by the City of Moses Lake upon completion if the facilities are
built to city standards.
4. A Subdivision Maintenance Bond shall be provided by the developer for a two-year
maintenance period which commences on August 25, 2025.
Resolved:
1. The City Council of the City of Moses Lake accepts Barrington Point 5 Phase 2 street
and utility improvements as facilities of the City of Moses Lake and as such will
charge for use of facilities as authorized by ordinance.
2. After August 26, 2025, all operational costs of the said street and utility
improvements shall be borne by the City of Moses Lake as provided by city
ordinance and subject to the required maintenance bond.
3. Subject to final inspection, after August 26, 2027, all further maintenance and
operational costs of said street and utility improvements shall be borne by the City of
Moses Lake, as provided by city ordinance.
ACCEPTED by the City Council on August 26, 2025.
______________________________
Dustin Swartz, Mayor
ATTEST:
_______________________________
Debbie Burke, City Clerk
Document Ref: 4I9EZ-ZM8YV-ACNSW-AYJDB Page 1 of 1
REF. NUMBER
4I9EZ-ZM8YV-ACNSW-AYJDB
DOCUMENT COMPLETED BY ALL PARTIES ON
28 AUG 2025 23:54:35 UTC
SIGNER TIMESTAMP SIGNATURE
MAYOR DUSTIN SWARTZ
EMAIL
DSWARTZ@CITYOFML.COM
SENT
27 AUG 2025 17:13:07 UTC
VIEWED
27 AUG 2025 23:23:39 UTC
SIGNED
27 AUG 2025 23:23:57 UTC
IP ADDRESS
74.82.240.250
LOCATION
MOSES LAKE, UNITED STATES
RECIPIENT VERIFICATION
EMAIL VERIFIED
27 AUG 2025 23:23:39 UTC
DEBBIE BURKE
EMAIL
DBURKE@CITYOFML.COM
SENT
27 AUG 2025 17:13:07 UTC
VIEWED
28 AUG 2025 22:49:06 UTC
SIGNED
28 AUG 2025 23:54:35 UTC IP ADDRESS
63.135.54.162
LOCATION
MOSES LAKE, UNITED STATES
RECIPIENT VERIFICATION
EMAIL VERIFIED
28 AUG 2025 22:49:06 UTC
Signed with PandaDoc PAGE 1 OF 1