Loading...
2171_00001ORDINANCE NO.2171 ANORDINANCE AMENDINGCHAPTER 13.08 OF THE MOSES LAKEMUNICIPALCODEENTITLED"WATERANDSEWER CONNECTIONS" THE CITY COUNCIL OF THE CITYOF MOSES LAKE,WASHINGTON DO ORDAINAS FOLLOWS: Section 1.Chapter 13.08 of the Moses Lake Municipal Code entitled "Water and Sewer Connections"isamendedasfollows: 13.08.092 Water Connection Charges -Central Drive Road and UtilityConstruction Project:Water serviceinstalledbytheCityofMosesLakealongCentralDriveandEvelynDriveinSection15,Township19North,Range 28 East,W.M.underthe Central DriveRoad and UtilityConstruction Project,shallbeassessedonthepropertiesasshownbelow.The charge shall be paid upon propertysubdivisionexceptforParkplacePlat,application ofa building permit,or upon request toconnecttocitywater.Water shall not be turnedon or be allowedto remain turnedon ifthe charge is notpaid.The charge shall be a portion for the regular permit fee for water services as required byordinance.The reimbursement shall be placed in Fund 477. Grape Drive Ball Field Plat $16.79/frontfoot Parkplace -Lot 1 $11,000/buildingplus($55,120.34maximum for lot)$0.50/S.F.building area Parkplace -Lot 2 $14,000/buildingplus($77,963.88maximum for lot)$0.60/S.F,building area Parcel 1,Lot3,Parkplace Plaza Major Plat Binding Site Plan $2,760 Parcel 2,Lot3,Parkplace Plaza Major Plat Binding Site Plan $10,631 Parcel 3,Lot3,Parkplace Plaza Major Plat Binding Site Plan $8,855 Park Orchard Tract 13 less taxparcels $5,527.60 Park Orchard Tract 8 $1,075,00/service(connecttostubout) Park Orchard Tract 29 $15.91/frontfoot Tax #12550 $1,075,00/service(connectto stubout) (Buildingarea is the totalarea encompassed by the exterior footings of the building.) 13.08.154 Sewer Connection Charges -CentralDrive Road and UtilityConstruction Project:Sewer serviceinstalledbytheCityofMosesLakealongCentralDriveandEvelynDriveinSection15,Township19North,Range 28 East,W.M.undertheCentralDrive Road and UtilityConstruction Project,shallbeassessedonthepropertiesasshownbelow.The charge shall be paid upon propertysubdivisionexceptforParkplacePlat,applicationofa building permit,oruponrequest toconnecttocitysewer.The charge shall be a portion for theregular permit fee for sewer services asrequiredbyordinance.The reimbursement shallbe placed in Fund 477. Grape Drive Ball Field Plat $15.42/frontfoot Parkplace -Lot 1 $7,000/buildingplus($38,528.67maximum for lot)$O.40/S.F.building area Parkplace -Lot2 $7,000/buildingplus($29,588.53maximum for lot)$0.40/S.F.building area Parcel 1,Lot3,Parkplace Plaza Major Plat Binding Site Plan $2,095 Parcel 2,Lot3,Parkplace Plaza Major Plat Binding Site Plan $8,072 Parcel 3,Lot3,Parkplace Plaza Major Plat Binding Site Plan $6,723 Park Orchard Tract 13 less tax parcels $4,197.13 Park Orchard Tract 8 $24,70/frontfoot Tax #12550 $24.70/frontfoot Section 2.This ordinance shalltake effect and be in force five (5)days after its passage and publication ofitssummaryasprovidedbylaw. Adopted by the CityCouncil and signed by its Mayor uly27,2004. ATTEST: Ronald VCovey,Mayo anald R.Cone,Finance Director O APPROVED AS TO FOR : lamesA Ñhitaker,CityAttorney O