2171_00001ORDINANCE NO.2171
ANORDINANCE AMENDINGCHAPTER 13.08 OF THE MOSES LAKEMUNICIPALCODEENTITLED"WATERANDSEWER CONNECTIONS"
THE CITY COUNCIL OF THE CITYOF MOSES LAKE,WASHINGTON DO ORDAINAS FOLLOWS:
Section 1.Chapter 13.08 of the Moses Lake Municipal Code entitled "Water and Sewer Connections"isamendedasfollows:
13.08.092 Water Connection Charges -Central Drive Road and UtilityConstruction Project:Water serviceinstalledbytheCityofMosesLakealongCentralDriveandEvelynDriveinSection15,Township19North,Range 28 East,W.M.underthe Central DriveRoad and UtilityConstruction Project,shallbeassessedonthepropertiesasshownbelow.The charge shall be paid upon propertysubdivisionexceptforParkplacePlat,application ofa building permit,or upon request toconnecttocitywater.Water shall not be turnedon or be allowedto remain turnedon ifthe charge is notpaid.The charge shall be a portion for the regular permit fee for water services as required byordinance.The reimbursement shall be placed in Fund 477.
Grape Drive Ball Field Plat $16.79/frontfoot
Parkplace -Lot 1 $11,000/buildingplus($55,120.34maximum for lot)$0.50/S.F.building area
Parkplace -Lot 2 $14,000/buildingplus($77,963.88maximum for lot)$0.60/S.F,building area
Parcel 1,Lot3,Parkplace Plaza Major Plat Binding Site Plan $2,760
Parcel 2,Lot3,Parkplace Plaza Major Plat Binding Site Plan $10,631
Parcel 3,Lot3,Parkplace Plaza Major Plat Binding Site Plan $8,855
Park Orchard Tract 13 less taxparcels $5,527.60
Park Orchard Tract 8 $1,075,00/service(connecttostubout)
Park Orchard Tract 29 $15.91/frontfoot
Tax #12550 $1,075,00/service(connectto stubout)
(Buildingarea is the totalarea encompassed by the exterior footings of the building.)
13.08.154 Sewer Connection Charges -CentralDrive Road and UtilityConstruction Project:Sewer serviceinstalledbytheCityofMosesLakealongCentralDriveandEvelynDriveinSection15,Township19North,Range 28 East,W.M.undertheCentralDrive Road and UtilityConstruction Project,shallbeassessedonthepropertiesasshownbelow.The charge shall be paid upon propertysubdivisionexceptforParkplacePlat,applicationofa building permit,oruponrequest toconnecttocitysewer.The charge shall be a portion for theregular permit fee for sewer services asrequiredbyordinance.The reimbursement shallbe placed in Fund 477.
Grape Drive Ball Field Plat $15.42/frontfoot
Parkplace -Lot 1 $7,000/buildingplus($38,528.67maximum for lot)$O.40/S.F.building area
Parkplace -Lot2 $7,000/buildingplus($29,588.53maximum for lot)$0.40/S.F.building area
Parcel 1,Lot3,Parkplace Plaza Major Plat Binding Site Plan $2,095
Parcel 2,Lot3,Parkplace Plaza Major Plat Binding Site Plan $8,072
Parcel 3,Lot3,Parkplace Plaza Major Plat Binding Site Plan $6,723
Park Orchard Tract 13 less tax parcels $4,197.13
Park Orchard Tract 8 $24,70/frontfoot
Tax #12550 $24.70/frontfoot
Section 2.This ordinance shalltake effect and be in force five (5)days after its passage and publication ofitssummaryasprovidedbylaw.
Adopted by the CityCouncil and signed by its Mayor uly27,2004.
ATTEST:
Ronald VCovey,Mayo
anald R.Cone,Finance Director O
APPROVED AS TO FOR :
lamesA Ñhitaker,CityAttorney
O