11272012Part1Brent Reese
Jason Avila
Jon Lane
MOSES LAKE CITY COUNCIL
Bill Ecret
Mayor
HOSES LAKE
Joseph K. Gavinski
City Manager
David Curnel
Karen Liebrecht
Dick Deane
November 27, 2012 AGENDA
Sophia Guerrero, Executive Secretary
Civic Center -Council Chambers
7:00 p.m.
1. Roll Call
2. Pledge of Allegiance
3. IDENTIFICATION OF CITIZENS WANTING TO DISCUSS AGENDA ITEMS
IDENTIFICATION OF CITIZENS WANTING TO DISCUSS NON-AGENDA ITEMS
4. PRESENTATIONS AND AWARDS -None
5. CONSENT AGENDA
A. Approval of Minutes -November 13,2012
B. Approval of Bills and Checks Issued
C. Accept Work -Wastewater Telemetry Project -2012
6. COMMISSION APPOINTMENTS -None
7. CONSIDERATION OF BIDS AND QUOTES -None
8. PETITIONS, COMMUNICATIONS, OR PUBLIC HEARINGS
A. Communications -Moses Lake Public Library -ML Public Library Foundation
B. Public Hearing -2012 Comprehensive Plan Amendments
9. ORDINANCES AND RESOLUTIONS
A. Ordinance -2013 Budget -2'" Rcading
B. Ordinance -Amend Ordinance No. 2662 -Single Reading
C. Ordinance -Authorizing Issuance and Sale of Limited Tax and General Obligation
Bonds -Single Reading
D. Ordinance -Amend 2012 Budget -1" Reading
E. Resolution -Accept Donation of Thirty (30) Blue and Green Spruce Trees -Superior Building
Manufacturing -Willi Schulz
F. Resolution -Accept Donation of Trees and Shrubs -Home Depot
10. REQUEST TO CALL FOR BIDS -None
11. REFERRALS FROM COMMISSIONS -None
12. OTHER ITEMS FOR COUNCIL CONSIDERATION
A. Request Deviation -Driveway Width -Ernie's Truck Stop
B. Library Accessible Restrooms
13. NON-AGENDA ITEMS AND PUBLIC QUESTIONS AND COMMENTS
14. COUNCIL QUESTIONS AND COMMENTS
IS. CITY MANAGER REPORTS AND COMMENTS -None
Executive Session -Litigation
Finance Municipal Services Police Chief Parks & Recreation Fire Chief Community Development City Attorney w. Robert Gary Harer Dean Mitchell Spencer Grigg Tom Taylor Gilbert Alvarado Katherine L.
Taylor Kenison
MOSES LAKE CITY COUNCIL
November 13,2012
DRAFT
Council Present: Bill Ecret, Dick Deane, Brent Reese, Jason Avila, David Curnel, Jon Lane, and
Karen Liebrecht
The meeting was called to order at 7 p.m . by Mayor Ecret.
PLEDGE OF ALLEGIANCE: Captain Sands led the Council in the pledge of allegiance.
PRESENTATIONS AND AWARDS -None
CONSENT AGENDA
Minutes: The minutes of the October 23 meeting were presented for approval.
Approval of Claims, Prepaid Claims, Checks, and Payroll: Vouchers audited and certified by the
Finance Director as required by RCW 42 .24.080, and those expense reimbursement claims,
certified as required by RCW 42.24 .090, have been recorded on a listing which has been made
available to the Council for approval and is retained for public inspection at the Civic Center. As
of November 13, 2012 the Council does approve for payment claims in the amount of
$1 ,353,314.01; prepaid claims in the amounts of $1 0,879.72, $80,312.03, and $105,495.61 ; claim
checks in the amount of $883,849.66; and payroll in the amounts of $322,599.12, $5,294.04, and
$319,415.53.
Accept Work -Stratford Road Crosswalk Project: Neppel Electric and Controls, LLC has completed
work on the 2012 Stratford Road Crosswalk project. The work should be accepted and the 60 day
lien period entered into.
Accept Work -Division Street Lift Station Project: William Charles West has completed work on
the 2012 Division Street Lift Station Project. The work should be accepted and the 60 day lien
period entered into.
Accept Work -Central Operations Facility Improvement Project: Selland Construction, Inc. has
completed work on the 2011 COF Improvement Project. The work should be accepted and the 60
day lien period entered into.
Blackstone Preliminary Major Plat and Findings of Fact: Blackstone OTR LLC has submitted an
application for a one-lot plat of 27.34 acres at 8037 Randolph Road. The site is zoned Heavy
Industrial, which corresponds with the Comprehensive Plan Land Use Designation of Industrial. A
deferral was requested for street improvements. The Planning Commission recommended that
the preliminary plat be approved with conditions. The Findings of Fact were presented for
approval.
Rathbone Preliminary Major Plat and Findings of Fact: Rathbone Sales, Inc. submitted a
preliminary plat of7.48 acres at 3860 E. Broadway. There is an existing agricultural and equipment
sales facility on site. The site is zoned Heavy Industrial, which corresponds with the
Comprehensive Plan Land Use Designation of Industrial. Deferrals were requested for sidewalk
improvements, connection to water and sewer, and moving the existing driveway location to meet
Community Standards. A deviation was requested for lot configuration. The Planning Commission
recommended that the preliminary plat be approved with conditions . The Findings of Fact were
presented for approval.
CITY COUNCIL MINUTES: 2 November 13, 2012
Blue Heron Park Final Major Plat and Findings of Fact: The City of Moses Lake has submitted a
final plat fo r a one-lot plat of 76.5 acres at 111 Westshore Drive , the existing Blue Heron Park and
the undeveloped City-owned property to the north. The site is zoned Public and the
Comprehensive Plan Land Use Designation is Parks/Open Space. There have been no significant
changes from the preliminary plat. The Planning Commission recommended that the final plat be
approved with conditions. The Findings of Fact were presented for approval.
Action Taken: Mr. Reese moved that the Consent Agenda be approved, seconded by Mr. Lane,
and passed unanimously.
COMMISSION APPOINTMENTS
PARKS AND RECREATION COMMISSION
Mayor Ecret requested confirmation of the appointment of David Enquist to the Parks and
Recreation Commission.
Action Taken: Dr. Curnel moved that the appointment be confirmed, seconded by Mr. Avila, and
passed unanimously.
CONSIDERATION OF BIDS AND QUOTES -None
PETITIONS, COMMUNICATIONS. OR PUBLIC HEARINGS
ORDINANCE -2013 BUDGET -1ST READING/PUBLIC HEARING
An ordinance was presented which establishes the budget for 2013.
The ordinance adopting the budget for the City of Moses Lake, Washington for the year of 2013
was read by title only.
The public hearing was opened. There were no comments.
Action Taken: Dr. Curnel moved that the public hearing be closed , seconded by Mr. Avila , and
passed unanimously.
A letter was read from the North Central Regional Library concerning the need to make the
restrooms in the library handicapped accessible and the need for painting the outside of the
building.
Joseph K. Gavinski, City Manager, stated that staff has investigated the remodeling of the building
but those improvements were put on hold because of the possibility of major changes to the
bu ilding. He mentioned that staff has considered remodeling the restrooms in the staff area into
a unisex restroom for the public. The access would be through the staff work area. The building
is scheduled to be painted in 2013.
There was considerable discussion about past proposed improvements to the library.
Action Taken: Mr. Deane moved that the first reading of the ordinance be adopted, seconded by
Mr. Avila, and passed unanimously.
CITY COUNCIL MINUTES: 3 November 13,2012
ORDINANCES AND RESOLUTIONS
ORDINANCES -TAXATION -2 ND READINGS
Ordinances were presented which fix the estimated amount to be received by the City from
property taxes and sets the tax levy rate .
The ordinance fixing the amount to be received for municipal purposes from taxations on assessed
valuations on property within the City of Moses Lake, Washington for 2013 was read by title only.
Action Taken: Mr. Deane moved that the second reading of the ordinance be adopted, seconded
by Mr. Lane, and passed unanimously.
The ordinance fixing the estimated amount to be received for municipal purposes from taxations
on assessed valuations on property within the City of Moses Lake, Washington for 2013 was read
by title only.
Action Taken: Mrs. Liebrecht moved that the second reading of the ordinance be adopted,
seconded by Dr. Curnel, and passed unanimously.
RESOLUTION -ACCEPT DONATION -2012 CONCERT SERIES
A resolution was presented which accepts the donations from various businesses and
organizations for the 2012 Centennial Theater Summer Concert Series and Movies in the Parks
Program.
The resolution accepting contributions for the City of Moses Lake Centennial Theater Summer
Concert Series and Movies in the Parks Program was read by title only.
Action Taken: Mr. Avila moved that the resolution be adopted, seconded by Mr. Reese, and passed
unanimously.
RESOLUTION -ACCEPT DONATION -EKA CHEMICALS
A resolution was presented which accepts the donation of three self-contained breathing apparatus
face pieces and four pack frames for the Fire Department valued at $3,000.
The resolution accepting a donation of self-contained breathing apparatus face pieces and pack
frames from Eka Chemical was read by title only.
Action Taken: Mr. Lane moved that the resolution be adopted, seconded by Mr. Avila, and passed
unanimously.
RESOLUTION -ACCEPT DONATION -PHILLIPS
A resolution was presented which accepts the donation of flooring and cabinet doors valued at
$2,300 from Todd Phillips . These items will be repurposed and utilized in the construction of
displays at the Moses Lake Museum and Art Center.
The resolution accepting a donation of bamboo flooring and maple cabinet doors valued at $2,300
from Todd Phillips was read by title only.
Action Taken: Mr. Reese moved that the resolution be adopted, seconded by Mr. Avila, and passed
unanimously.
CITY COUNCIL MINUTES: 4 November 13, 2012
RESOLUTION -ACCEPT PARC GRANT FUNDS
A resolution was presented which accepts a $15,000 grant from the Grant County Prevention and
Recovery Center (PARC). The funds will be used to provide training from the Washington State
Liquor Control Board for police officers who will work with PARC on enforcement strategies such
as compliance checks, party intervention patrols, and source investigations.
The resolution accepting a grant from the Grant County Prevention and Recovery Center was read
by title only.
Action Ta ken: Dr. Curnel moved that the resolution be adopted, seconded by Mr. Avila, and passed
unanimously.
REQUEST TO CALL FOR BIDS -None
REFERRALS FROM COMMISSIONS -None
OTHER ITEMS FOR COUNCIL CONSIDERATION
POWER POINTE #2 AND #3 PRELIMINARY PLATS -REQUEST FOR EXTENSION
Gary Mann, on behalf of the owners, has requested the extension of preliminary plat approval for
the Power Pointe 2 and Power Pointe 3 Plats. These preliminary plats were approved December
13, 2005 and that approval will expire December 13, 2012.
Gilbert Alvarado, Community Development Director, stated that the property has been recently
purchased and the new owner is requesting the extension of the plat approvals. He pointed out
that only one extension is allow and if no action is taken on the plats, they will become null and void
on December 2013.
Action Taken: Dr. Curnel moved that the request be granted , seconded by Mrs. Liebrecht, and
passed unanimously.
SIGN PLACEMENT STANDARDS
Several changes were proposed to the Sign Placement Standards that would require political signs
on city-owned property be limited to 30 days prior to the primary and general elections and that
they be removed within 5 days after those elections.
Spencer Grigg, Parks and Recreation Director, stated that signs on City property interfere with the
staff's ability to provide maintenance on the sites such as weed control and mowing.
There was some discussion by the Council.
Action Taken: Mrs. Liebrecht moved that the changes to the sign placement standards be
approved, seconded by Dr. Curnel, and passed unanimously.
NON-AGENDA ITEMS AND PUBLIC QUESTIONS AND COMMENTS -None
COUNCIL QUESTIONS AND COMMENTS -None
CITY COUNCIL MINUTES: 5 November 13, 2012
CITY MANAGER REPORTS AND COMMENTS
WCIA 2012 ANNUAL REVIEW AND AUDIT
Joseph K. Gavinski, City Manager, provided the report of the annual review and audit conducted
by the Washington Cities Insurance Authority.
2013 COUNCIL/STAFF RETREAT
Joseph K. Gavinski, City Manager, suggested either February 22 and 23 or March 1 and 2 for the
2013 Council/staff retreat.
DECEMBER COUNCIL MEETING
Joseph K. Gavinski, City Manager, pointed out that the Council's second meeting in December is
scheduled for Christmas Day and suggested that the meeting be rescheduled to December 27.
It was the consensus of the Council that the meeting be changed to December 27.
BUILDING ACTIVITY REPORT
The October 2012 Building Activity Report was presented.
INVESTMENT REPORT
The City received $14,788.43 in investment income for October 2012.
SALES TAX/TRANSIENT RENTAL INCOME
The City received $455,185.85 in sales tax and $57,117.62 in transient rental income in October
2012.
The regular meeting was recessed at 8 p.m. and the Council met in a 20 minute executive session
to discuss labor relations. The executive session was adjourned 8:20 p.m. and the regular meeting
was reconvened.
WAGES INCREASES FOR 2013
Joseph K. Gavinski, City Manager, reported that the Police Department Guild members will receive
a 2% wage increase according to contract and that the Fire Department union members will receive
a 2.5% wage increase according to their contract.
Action Taken: Mr. Deane moved that the City of Moses Lake Association Members and exempt
staff, including the City Manager, receive a 2% wage increase, seconded by Mr. Avila, and passed
unanimously.
The regular meeting was adjourned at 8:25 p.m.
ATTEST Bill J. Ecret, Mayor
W . Robert Taylor, Finance Director
DATE 11/21/12
TIME 08:12:27
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 1
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
DATABAR 00007974
WATER/BILLING POSTAGE 0000064419 495.39 MAIL UTILITY BILLS
SEWER/BILLING POSTAGE 0000064419 391. 70 MAIL UTILITY BILLS
SANITATION FUND POSTAGE 0000064419 220.16 MAIL UTILITY BILLS
STORM WATER POSTAGE 0000064419 72.55 MAIL UTILITY BILLS
AMBULANCE SERVICE POSTAGE 0000064419 60.53 MAIL UTILITY BILLS
======================
TOTAL: 1,240.33
STERLING SAVINGS BANK 00007077
LEGISLATIVE OPERATING SUPPLIES 0000064423 87.30 SUPPLIES/T & S
LEGISLATIVE REGISTRATION & MEMBERSHIPS 0000064423 45.00 SUPPLIES/T & S
FINANCE TRAVEL & SUBSISTENCE /NON-ED 0000064334 85.73 MISC SUPPLIES/T & S
COMMUNITY DEVELOPMEN OPERATING SUPPLIES 0000064324 21.26 OFFICE SUPPLIES
COMMUNITY DEVELOPMEN OPERATING SUPPLIES 0000064325 347.19 OFFICE SUPPLIES/BOOTS-TRUMBULL
LEGAL/JUDICIAL TRAVEL & SUBSISTENCE /NON-ED 0000064423 344.34 SUPPLIES/T & S
MISC. SERVICES OPERATING SUPPLIES 0000064334 65.46 MISC SUPPLIES/T & S
MISC. SERVICES OPERATING SUPPLIES 0000064472 620.28 SUPPLIES, TRAVEL EXPENSE
MISC. SERVICES TRAVEL & SUBSISTENCE /NON-ED 0000064472 270.04 SUPPLIES, TRAVEL EXPENSE
ENGINEERING TRAVEL & SUBSISTENCE /NON-ED 0000064332 16 .62 MISC SUPPLIES/T & S
ENGINEERING OPERATING SUPPLIES 0000064472 233.68 SUPPLIES, TRAVEL EXPENSE
ENGINEERING SMALL EQUIPMENT < $1000 0000064472 58.19 SUPPLIES, TRAVEL EXPENSE
ENGINEERING TRAVEL & SUBSISTENCE /NON-ED 0000064472 1,257.24 SUPPLIES , TRAVEL EXPENSE
PARK RECREATION OFFICE SUPPLIES 0000064326 301. 99
PARK RECREATION OPERATING SUPPLIES 0000064326 59.08
PARK RECREATION OPERATING SUPPLIES 0000064326 29.04
PARK RECREATION OPERATING SUPPLIES 0000064326 119.38
PARK RECREATION PROFESSIONAL SERVICES 0000064326 14 0.00
DATE 11/21/12
TIME 08:12:27
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 2
XAPPRVD
VENOOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
STERLING SAVINGS BANK 00007077
PARK RECREATION OPERATING SUPPLIES 0000064326 1,309.27
PARK RECREATION OPERATING SUPPLIES 0000064326 132.35
PARK RECREATION MUSEUM RESALE 0000064326 601. 04
PARK RECREATION POSTAGE 0000064326 52.29
PARK RECREATION PRINTING & BINDING 0000064326 581.40
PARK RECREATION OPERATING SUPPLIES 0000064326 107.89
PARK RECREATION REPAIR AND MAINTENANCE SUPPL 0000064326 515.10
PARK RECREATION REPAIR & MAINT. EQUIP. (CONT 0000064326 1,033.14
PARK RECREATION OPERATING SUPPLIES 0000064326 495.26
POLICE OPERATING SUPPLIES 0000064401 556.68 MISCELLANEOUS
POLICE POSTAGE 0000064401 209.06 MISCELLANEOUS
POLICE SMALL EQUIPMENT < $1000 0000064401 130.00 MISCELLANEOUS
POLICE TRAVEL & SUBSISTENCE /NON-ED 0000064401 385.87 MISCELLANEOUS
FIRE OPERATING SUPPLIES 0000064332 39.80 MISC SUPPLIES/T & S
FIRE OPERATING SUPPLIES 000006433 3 148.93 MISC SUPPLIES
GRANTS AND DONATIONS OPERATING SUPPLIES 0000064326 160.35
GRANTS AND DONATIONS OPERATING SUPPLIES 0000064326 1,549.36
GRANTS AND DONATIONS MINOR EQUIPMENT < $5000 0000064401 278.75 MISCELLANEOUS
GRANTS AND DONATIONS REGISTRATION & MEMBERSHIPS 0000064401 760.50 MISCELLANEOUS
STREET TRAVEL & SUBSISTENCE /NON-ED 0000064332 170.12 MISC SUPPLIES/T & S
WATER TRAVEL & SUBSISTENCE /NON-ED 0000064332 14.96 MISC SUPPLIES /T & S
SEWER OPERATING SUPPLIES 0000064332 973.60 MISC SUPPLIES/T & S
WATER/BILLING POSTAGE 0000064334 9.76 MISC SUPPLIES/T & S
STORM WATER TRAVEL & SUBSISTENCE /NON-ED 0000064332 170.13 MISC SUPPLIES/T & S
DATE 11/21/12
TIME 08:12 :27
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 3
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
STERLING SAVINGS BANK 00007077
STORM WATER OPERATING SUPPLIES
AIRPORT TRAVEL & SUBSISTENCE /NON-ED
AMBULANCE SERVICE OPERATING SUPPLIES
AMBULANCE SERVICE SMALL EQUIPMENT < $1000
AMBULANCE SERVICE PROFESSIONAL SERVICES
CENTRAL SERVICES OPERATING SUPPLIES
CENTRAL SERVICES MINOR EQUIPMENT < $5000
CENTRAL SERVICES SMALL EQUIPMENT < $1000
CENTRAL SERVICES PROFESSIONAL SERVICES
EQUIP RENTAL-OPERATI GAS-PROPANE-FUEL
EQUIP RENTAL-OPERATI REPAIR AND MAINTENANCE SUPPL
EQUIP RENTAL-OPERATI GAS-PROPANE-FUEL
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL
UNITED PARCEL SERVICE 00005456
MISC . SERVICES POSTAGE
EQUIP RENTAL-OPERATI POSTAGE
0000064472 23.72 SUPPLIES, TRAVEL EKPENSE
0000064423 111. 30 SUPPLIES/T & S
0000064333 24.19 MISC SUPPLIES
0000064333 190.50 MISC SUPPLIES
0000064334 523.00 MISC SUPPLIES/T & S
0000064334 33.12 MISC SUPPLIES/T & S
0000064334 2,308.04 MISC SUPPLIES/T & S
0000064334 281.16 MISC SUPPLIES/T & S
0000064334 7,154 .44 MISC SUPPLIES/T & S
0000064323 114.15 FUEL
0000064332 1,066.41 MISC SUPPLIES/T & S
0000064472 100.61 SUPPLIES, TRAVEL EXPENSE
0000064332 199.06 MISC SUPPLIES/T & S
======================
TOTAL:
0000064418
0000064418
TOTAL:
26,617.13
40.00
10.34
50.34
SHIPPING CHARGES
SHIPPING CHARGES
======================
REPORT TOTAL: 27,907.80
DATE 11/21/12 TOTALS PAGE
TIME 08:12:29 XAPPRVD
CITY OF MOSES LAKE
TABULATI O N OF CLAIMS TO BE APPROVED
COUNCIL MEETING O F
TOTALS BY FUND
FUND NO FUND NAME
000 GENERAL FUND
103 GRANTS AND DONATIONS
116 STREET
410 WATER/SEWER
490 SANITATION FUND
493 STORM WATER
495 AIRPORT
498 AMBULANCE SERVICE FUND
517 CENTRAL SERVICES
519 EQUIPMENT RENTAL
528 BUILD MAINTENANCE
TOTAL
CHANGES TO BE MADE SHOULD BE LISTED BELOW
11/27/2012
AMOUNT
10,439.90
2,748.96
170 .12
1,885 .41
220.16
266.40
111.30
798.22
9,776 .76
1,291.51
199.06
27,907.80
VEND NO. P.O. NO. AMT LISTED CORRECTED AMT ACTION TO BE TAKEN
CORRECT AMOUNT TO BE PAID
*t"''''''''''''' * ...... * * * ... * ...... * * * ... * ... * ............... * * *" ...... * * * ... it
•
• CLAIMS APPROVAL •
• •
• WE, THE UNDERSIGNED COUNCILMEN OF THE CITY OF MOSES LAKE, WASHINGTON, DO HEREBY CERTIFY THAT THE MERCHANDISE •
• OR SERVICES SPECIFIED HAVE BEEN RECEIVED AND THAT ABOVE CLAIMS ARE APPROVED, AS NOTED, FOR PAYMENT
• IN THE AMOUNT OF $27,907.80 THIS 27TH DAY OF NOVEMBER, 2012
•
•
• COUNCIL MEMEER • • •
• COUNCIL MEMBER
COUNCIL MEMEER
FINANCE DIRECTOR
•
• •
•
• • •
•
•
*t * * * * * * * * * * * * * * * * * * * * ...... * * * ... * * * * * * * * * * *t
DATE 11/15/12
TIME 10:44:09
NAME OF VENDOR
Depa,tment
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E 0
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditu,e Account
PAGE 1
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
DATABAR 00007974
WATER/BILLING POSTAGE 0000064336 790.07 MAIL UTILITY BILLS
SEWER/BILLING POSTAGE 0000064336 624.70 MAIL UTILITY BILLS
SANITATION FUND POSTAGE 0000064336 351.12 MAIL UTILITY BILLS
STORM WATER POSTAGE 0000064336 115.72 MAIL UTILITY BILLS
AMBULANCE SERVICE POSTAGE 0000064336 96.53 MAIL UTILITY BILLS
======================
TOTAL: 1,978.14
HOME DEPOT CREDIT SERVICES 00007824
ENGINEERING SMALL EQUIPMENT < $1000 0000064330 613.02 MISC SUPPLIES
PARK RECREATION REPAIR AND MAINTENANCE SUPPL 0000064330 69.76 MISC SUPPLIES
PARK RECREATION OPERATING SUPPLIES 0000064330 187.23 MISC SUPPLIES
PARK RECREATION OPERATING SUPPLIES 0000064330 92.57 MISC SUPPLIES
PARK RECREATION REPAIR AND MAINTENANCE SUPPL 0000064330 27.57 MISC SUPPLIES
PARKS / STREET IMPROVE/ OTHER THAN BUILDING 0000064330 30.92 MISC SUPPLIES
WATER OPERATING SUPPLIES 0000064330 164.98 MISC SUPPLIES
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064330 22 .55 MISC SUPPLIES
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064330 100.03 MISC SUPPLIES
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064330 55.26 MISC SUPPLIES
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064330 38.32 MISC SUPPLIES
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064330 132.20 MISC SUPPLIES
======================
TOTAL: 1,534.41
LOWES 00003886
ENGINEERING SMALL EQUIPMENT < $1000 0000064331 261. 78 MISC SUPPLIES
PARK RECREATION OPERATING SUPPLIES 0000064331 89.23 MISC SUPPLIES
PARK RECREATI ON OPERATING SUPPLIES 0000064331 37.74 MISC SUPPLIES
WATER REPAIR AND MAINTENANCE SUPPL 000006 4331 10.19 MISC SUPPLIES
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064331 33.45 MISC SUPPLIES
DATE 11/15/12
TIME 10:44:09
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 2
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
LOWES 00003886
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064331 105.29 MISC SUPPLIES
======================
TOTAL: 537.68
SIGNS NOW 00007051
EQUIP RENTAL-OPERATI REPAIR & MAINT. EQUIP. (CONT 0000064337 807.11 GRAPHICS FOR POLICE CARS
EQUIP RENTAL-OPERATI LEASE PURCRASE DEFERRING TO 0000064337 807.09 GRAPHICS FOR POLICE CARS
EQUIP RENTAL-OPERATI LEASE PURCRASE DEFERRING TO 0000064337 807.09 GRAPHICS FOR POLICE CARS
EQUIP RENTAL-OPERATI LEASE PURCRASE DEFERRING TO 0000064337 807.09 GRAPHICS FOR POLICE CARS
EQUIP RENTAL-OPERATI LEASE PURCRASE DEFERRING TO 0000064337 807.09 GRAPHICS FOR POLICE CARS
EQUIP RENTAL-OPERATI LEASE PURCRASE DEFERRING TO 0000064337 807.09 GRAPHICS FOR POLICE CARS
TOTAL: 4,842.56
======================
REPORT TOTAL: 8,892.79
DATE 11/15/12
TIME 10:44:11
CITY OF MOSES
TABULATION OF CLAIMS
LA K E
TO BE APPROVED
TOTALS BY FUND
FUND NO FUND NAME
000 GENERAL FUND
116 STREET
410 WATER/SEWER
490 SANITATION FUND
493 STORM WATER
498 AMBULANCE SERVICE FUND
519 EQUIPMENT RENTAL
528 BUILD MAINTENANCE
TOTAL
CHANGES TO BE MADE SHOULD BE LISTED BELOW
COUNCIL MEETING OF
11/27/2012
AMOUNT
1,378.90
30 .92
1,589.94
351.12
ll5.72
96 .53
4,842.56
487.10
8,892.79
VEND NO. P.O. NO. AMT LISTED CORRECTED AMT ACTION TO BE TAKEN
CORRECT AMOUNT TO BE PAID
TOTALS PAGE
XAPPRVD
**;,. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** , ,
, C L A I M SAP PRO V A L , ,
, WE, THE UNDERSIGNED COUNCILMEN OF THE CITY OF MOSES LAKE, WASHINGTON, DO HEREBY CERTIFY THAT THE MERCHANDISE '
, OR SERVICES SPECIFIED HAVE BEEN RECEIVED AND THAT ABOVE CLAIMS ARE APPROVED, AS NOTED, FOR PAYMENT '
, IN THE AMOUNT OF $8,892.79 THIS 27TH DAY OF NOVEMBER, 2012 ' , , , ,
, ,
, COUNCIL MEMBER , , ,
, COUNCIL MEMBER
COUNCIL MEMBER
FINANCE DIRECTOR
, ,
, , ,
** * * * * * * * * '* * * * * * '* '* * * * * * * * * * * '* * * * * * * * * * *t
DATE 11/21/12
TIME 09:16:58
PAGE 1
XAPPRVD
CIT Y 0 F M 0 S E S
TAB U L A T ION 0 F C L A I M S
LA K E
T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
NAME OF VENDOR
Department
VENDOR NO
Object Description
Expenditure Account
P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
AMERISTAY INN & SUITES
PARK RECREATION
ARROW HOCKEY AND SPORT CORP
PARK RECREATION
PARK RECREATION
00004371
PROFESSIONAL SERVICES
00006852
OPERATING SUPPLIES
OPERATING SUPPLIES
BANK OF NEW YORK -EFT 00006561
BUILD MAINT-DEBT SR PRINCIPAL G.O. BONDS
BUILD MAINT -DEBT SR INTEREST ON GO DEBT
BASIN LOCK & SECURITY 00003714
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL
BASIN SEPTIC SERVICES
PARK RECREATION
PARK RECREATION
PARK RECREATION
BATTERY SYSTEMS
AMBULANCE SERVICE
EQUIP RENTAL-OPERATI
BESSE MEDICAL SUPPLY
AMBULANCE SERVICE
00000166
REPAIR & MAINT. OTHER (CONTR
REPAIR & MAINT. OTHER (CONTR
REPAIR & MAINT. OTHER (CONTR
00004673
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
00006688
OPERATING SUPPLIES
BIG SKY FIRE/AFFIRMED MEDICAL 00006233
STREET OPERATING SUPPLIES
WATER
BLUE LINE TRAINING LLC
POLICE
OPERATING SUPPLIES
00007468
REGISTRATION & MEMBERSHIPS
0000064319
TOTAL:
0000064327
0000064327
TOTAL:
0000064435
0000064435
TOTAL:
0000064340
172.54
172 .54
102.90
336.70
439.60
545,000.00
68,956.25
613,956.25
12.89
MAC PRESENTER LODGING
ICE RINK SUPPLIES
ICE RINK SUPPLIES
DEBT SERV PYMT/2010 GO BOND
DEBT SERV PYMT/2010 GO BOND
LATCH GUARD
======================
TOTAL: 12 .89
0000064372 291. 34 SEPTIC SERVICES
0000064372 48.56 SEPTIC SERVICES
0000064372 129.48 SEPTIC SERVICES
======================
TOTAL: 469.38
0000064426 71.47 BATTERIES
0000064342 856.41 BATTERIES
======================
TOTAL : 927.88
0000064425 623.98 AMBULANCE SUPPLIES
======================
TOTAL:
0000064343
0000064343
TOTAL:
0000064396
623.98
46 .66
118.69
165 .35
198.00
FIRST AID SUPPLIES
FIRST AID SUPPLIES
REGISTRATION
======================
TOTAL: 198 .00
DATE 11/21/12
TIME 09:16:58
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 2
XAPPRVD
VENDOR NO
Object Description P,O, Number P,O, Amount Purpose of Purchase
=======================================================================================================================
BLUMENTHAL UNIFORM CO INC
POLICE
00000133
OPERATING SUPPLIES
BRENTS AUTOMATIC TRANS SERVICE 00006783
EQUIP RENTAL-OPERATI REPAIR & MAINT, EQUIP, (CONT
BRIAN OWENS 00007730
0000064404 1,577,76 UNIFORMS
======================
TOTAL: 1,577.76
0000064240 284.32 REPLACE FUEL PUMP
======================
TOTAL: 284.32
MISC. SERVICES TRAVEL & SUBSISTENCE /NON-ED 0000064473 83.41 TRAVEL EXPENSE
BSN SPORTS
PARK RECREATION
BURKE MARKETING & PROMOTION
TOURISM ACTIVITIES
TOURISM ACTIVITIES
TOURISM ACTIVITIES
00006942
OPERATING SUPPLIES
00005798
OPERATING SUPPLIES
PROFESSIONAL SERVICES
AOVERTISING
BUSINESS INTERIORS & EQUIPMENT 00003619
EXECUTIVE OPERATING SUPPLIES
CALIFORNIA CONTRACTORS SUPPLY 00006014
WATER
CASCAOE ANALYTICAL INC
WATER
SEWER
REPAIR AND MAINTENANCE SUPPL
00005014
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
CASCAOE NATUHAL GAS CORP 00000203
PARK RECREATION UTILITY EXPENSE / GAS
PARK RECREATION UTILITY EXPENSE / GAS
FIRE UTILITY EXPENSE / GAS
BUILD MAINT-OPERATIO UTILITY EXPENSE / GAS
======================
TOTAL:
0000064317
TOTAL:
0000064360
0000064360
0000064360
TOTAL:
0000064431
TOTAL:
0000064346
TOTAL:
0000064352
0000064352
83,41
1,159,80
1,159,80
875,00
8,223,60
2,886.00
11,984.60
228.70
228.70
119.90
119.90
539.00
914.34
MISC SUPPLIES
RETAINER/HOLIDAY SHOW
RETAINER/HOLIDAY SHOW
RETAINER/HOLIDAY SHOW
FILE FOLDERS
BLAOE TO CUT CONCRETE
SAMPLE TESTING
SAMPLE TESTING
======================
TUTAL:
0000064328
0000064328
0000064449
0000064449
1,453.34
42.84
231. 50
415.05
351.11
LRC GAS USAGE
LRC GAS USAGE
NAT GAS SERVICE
NAT GAS SERVICE
======================
TOTAL: 1,040,50
DATE 11/21/12
TIME 09:16:58
PAGE 3
XAPPRVD
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T ° B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
NAME OF VENDOR
Department
VENDOR NO
Object Description
Expenditure Account
P,O, Number P,O, Amount Purpose of Purchase
=======================================================================~===============================================
CEDAR STREET CLEANERS 00004655
POLICE OPERATING SUPPLIES
FIRE REPAIR & MAINT, EQUIP, (CONT
CENTRAL MACHINERY SALES INC 00002779
PARK RECREATION REPAIR & MAINT , EQUIP, (CONT
PARKS/STREET REPAIR & MAINT, EQUIP, (CONT
WATER OPERATING SUPPLIES
CENTRAL WASHINGTON CONCRETE 00003603
PARKS / STREET REPAIR AND MAINTENANCE SUPPL
CHASE PAYMENTECH-EFT
WATER/BILLING
SEWER/BILLING
SANITATION FUND
CITY OF MOSES LAKE
MISC. SERVICES
1998 REFUNDING GOB
00004046
BANK CHARGES
BANK CHARGES
BANK CHARGES
00008107
TO 2?? GOB FUNDS OS
TRANS TO 006 MISC SERVICES
00008201
PARK RECREATION UTILITY EXPENSE / W-S-G
SEWER UTILITY EXPENSE / W-S -G
BUILD MAINT-OPERATIO UTILITY EXPENSE / W-S-G
COLU!1BIA BASIN DAILY HERALD
EXECUTIVE
TOURISM ACTIVITIES
COLUMBIA BEARING SALES
SEWER
00000210
REGISTRATION & MEMBERSHIPS
ADVERTISING
00000274
REPAIR AND MAINTENANCE SUPPL
0000064400 631.19 UNIFORMS
0000063971 5,40 UNIFORM MAINT
======================
TOTAL: 636,59
0000064312 269 ,75 AIR COMPRESSOR RENTAL
0000064312 269,75 AIR COMPRESSOR RENTAL
0000064347 30,21 FORM TUBE
TOTAL: 569,71
0000064049 164,01 MISC SUPPLIES
======================
TOTAL: 164,01
0000064442 725.74 CREDIT CARD FEES
0000064442 725.74 CREDIT CARD FEES
0000064442 725.72 CREDIT CARD FEES
======================
TOTAL:
0000064451
0000064452
2,177.20
324.54
275.70
TRANS CASH/006 TO 285
TRANS FROM 284 TO 006
======================
TOTAL:
0000064456
000 0064456
0000064456
600.24
492,67
1,296 ,91
195.69
WATER SERVICE
WATER SERVICE
WATER SERVICE
======================
TOTAL:
0000064422
0000064335
1,985.27
143.65 SUSSCR RENEWAL
690.34 ADVERTISING -CB ALLIED ARTS
======================
TOTAL: 833.99
0000064348 848,31 V-BELTS
DATE 11/21/12
TIME 09:16:5B
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 4
XAPPRVD
NAME OF VENDOR
Department
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
COLUMBIA BEARING SALES 00000274
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL
COLUMBIA GLASS LLC 00005B67
BUILD MAINT-OPERATIO REPAIR & MAINT. BUILDING (CO
COMMERCIAL TIRE 0000596B
EQUIP RENTAL-OPERATI REPAIR AND MAINTENANCE SUPPL
CONCESSIONS SUPPLY
PARK RECREATION
CONSOLIDATED ELECTRIC DIST
PARK RECREATION
STREET
WATER
SEWER
SEWER
SEWER
BUILD flAINT-OPERATIO
CONSULT
POLICE
CROWN PAPER & JANITORIAL
000062B6
OPERATING SUPPLIES
00000B19
REPAIR AND MAINTENANCE SUPPL
REPAIR AND MAINTENANCE SUPPL
OPERATING SUPPLIES
OPERATING SUPPLIES
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
OPERATING SUPPLIES
00006353
PROFESSIONAL SERVICES
00007120
000006 434B 6.3B V-BELTS
TOTAL: B54.69
0000064345 290.94 TINTED GLASS
======================
TOTAL: 290.94
0000064350 1,707.B4 WHEELS, CABLE
======================
TOTAL: 1,707.B4
000006443B 75.53 SLUSH PUPPIE WINTERIZATION
TOTAL: 75 .53
0000064062 76.63 MISC SUPPLIES
0000064351 4B.02 MISC SUPPLIES
0000064351 196.26 MISC SUPPLIES
0000064351 112.54 MISC SUPPLIES
0000064351 B.74 MISC SUPPLIES
0000064351 42.46 rusc SUPPLIES
0000064351 33 .77 MISC SUPPLIES
======================
TOTAL: 51B.42
0000064392 900.00 POLYGRAPHS
======================
TOTAL: 900.00
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL 0000064349 4B6.63 CLEANER, FILTERS
DENNIS DUKE
POLICE
DEPT OF ECOLOGY
SEWER
00000347
DIRECT MEDICAL PAYMENTS
00003221
REGISTRATION & MENBERSHIPS
======================
TOTAL: 4B6.63
0000064455 255.00 MEDICAL NOT COY BY INS
TOTAL: 255.00
0000064344 1BO.00 WASTEWATER OPER CERT
======================
TOTAL: 1BO.00
DATE 11/21/12
TIME 09:16:5B
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 5
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
DON GARRISON
FIREMANS PENSION
DR LOU SOWERS
POLICE
EASTERN CASCADE DIST
POLICE
EVERGREEN IMPLEMENT INC
EQUIP RENTAL-OPERATI
EQUIP RENTAL-OPERATI
FABER INDUSTRIAL SUPPLY
PARK RECREATION
STREET
STORM WATER
FASTENAL COMPANY
PARK RECREATION
STREET
WATER
BUILD MAINT-OPERATIO
BUILD MAINT-OPERATIO
FERRELLGAS
SEWER
FOOD SERVICES OF AMERICA
PARK RECREATION
GRAINGER PARTS OPERATIONS
SEWER
0000276B
DIRECT MEDICAL PAYMENTS
00001B56
PROFESSIONAL SERVICES
00006909
OPERATING SUPPLIES
00005234
REPAIR AND MAINTENANCE SUPPL
REPAIR & MAINT. EQUIP . ICONT
00000501
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
SMALL EQUIPMENT < $1000
00007372
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
REPAIR AND MAINTENANCE SUPPL
00002207
GAS-PROPANE-FUEL
0000716B
LARSON REC COMPLEX RESALE
00002755
OPERATING SUPPLIES
0000064453 3,600.00 MEDICAL NOT COV BY INS
======================
TOTAL: 3,600.00
0000064390 450.00 PSYCHOLOGICAL
======================
TOTAL: 450.00
00000643B7 60.50 DRINKING WATER
======================
TOTAL: 60.50
0000064353 420.21 MSIC SUPPLIES, REPAIRS
0000064353 B43.92 MSIC SUPPLIES, REPAIRS
======================
TOTAL: 1,264.13
00000633BB 102.91 MISC SUPPLIES
0000064356 129.63 SIGN MATERIAL, SNAKE EXT
0000064356 107.20 SIGN MATERIAL, SNAKE EXT
======================
TOTAL: 339.74
0000064052 61. Bl MISC SUPPLIES
0000064355 16.91 MISC SUPPLIES
0000064355 211.93 MISC SUPPLIES
0000064355 352.69 MISC SUPPLIES
0000064355 55.02 MISC SUPPLIES
======================
TOTAL: 69B.36
0000064354 22.71 PROPANE
TOTAL: 22.71
0000064320 1,064.95 LRC RESALE
TOTAL: 1,064.95
0000064357 223.12 MISC SUPPLIES
DATE 11/21/12
TIME 09 :16:58
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M B BTl N G 0 F
11/27/2012
Expenditure Account
PAGE 6
XAPPRVD
NAME OF VENDOR
Department
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=========:=============================================================================================================
GRAINGBR PARTS OPERATIONS
SEWER
SEWER
BUILD MAINT-OPERATIO
BUILD MAINT-OPERATIO
BUILD MAINT-OPERATIO
BUILD MAINT-OPERATIO
GRCC/BAT
PARK RECREATION
HANSEN SUPPLY COMPANY
WATER
HARRYS RADIATOR SERVICE INC
00002755
REPAIR AND MAINTENANCE SUPPL
REPAIR AND MAINTENANCE SUPPL
OPERATING SUPPLIES
OPERATING SUPPLIES
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
00002869
REGISTRATION & MEMBERSHIPS
00007461
OPERATING SUPPLIES
00000709
BUILD MAINT-OPERATIO REPAIR & MAINT. BUILDING (CO
IBS INC 00004860
0000064357 942.78 MISC SUPPLIES
0000064357 177.17 MISC SUPPLIES
0000064357 475.05 MISC SUPPLIES
0000064357 91.24 MISC SUPPLIES
0000064357 37.55 MISC SUPPLIES
0000064357 97 .77 MISC SUPPLIES
TOTAL: 2,044.68
0000064329 42 .00 BACKFLOW CERTIFICATION/GARRET!
TOTAL: 42.00
0000064358 310.32 MARKING TAPE
======================
TOTAL: 310.32
0000064359 242.78 RESET GENERATOR HEADER
====================:=
TOTAL: 242.78
EQUIP RENTAL-OPERATI REPAIR AND MAINTENANCE SUPPL 0000064369 533.32 MISC SUPPLIES
IMSA
STREET
IRRIGATORS INC
STORM WATER
J P COOKE COMPANY
POLICE
JERRYS AUTO SUPPLY
00006190
REGISTRATION & MEMBERSHIPS
00003840
REPAIR AND MAINTENANCE SUPPL
00002797
OPERATING SUPPLIES
00005835
STREET REPAIR AND MAINTENANCE SUPPL
BUILD MAINT-OPERATIO REPAIR AND MAINTENANCE SUPPL
======================
TOTAL:
0000064362
TOTAL:
0000064361
TOTAL:
0000064399
TOTAL:
0000064363
0000064363
TOTAL:
5lJ.32
160.00 ANNUAL DUES
160.00
14.95 BRASS VALVES
14.95
152.00 SUPPLIES
152.00
20.35 MISC SUPPLIES
13.01 MISC SUPPLIES
33.36
DATE ll/21/12
TIME 09:16:58
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
ll/27 /2012
Expenditure Account
PAGE 7
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
KWIQ RADIO C/O COL RIVER MEDIA 00005659
TOURISM ACTIVITIES ADVERTISING 0000064339 1,000.00 ADVERTISING-ML BUSINESS ASSN
======================
TOTAL: 1,000.00
LAD IRRIGATION COMPANY INC OOOOllOl
PARK RECREATION REPAIR & MAINT. OTHER (CONTR 0000064305 215.80 MISC SUPPLIES
WATER OPERATING SUPPLIES 0000064364 105.68 STEEL PIPE
======================
TOTAL: 321.48
LAKESIDE DISPOSAL 00004080
SANITATION FUND GARBAGE CONTRACT 0000064257 181,514.04 CONTRACT PAYMENT
======================
TOTAL: 181,514.04
LOCALTEL COMMUNICATIONS 00004374
CENTRAL SERVICES PROFESSIONAL SERVICES 0000064018 1,661.90 INTERNET SERVICE
======================
TOTAL: 1,661.90
LONGLEAF SERVICES INC 00006718
PARK RECREATION MUSEUM RESALE 0000064458 34.45 MAC RESALE
======================
TOTAL: 34.45
MERCHANT SOLUTIONS -EFT 00005882
COMMUMITY DEVELOPMEN BANK CHARGES 0000064437 308.44 CREDIT CARD FEES
ENGINEERING BANK CHARGES 0000064437 417 .66 CREDIT CARD FEES
PARK RECREATION BANK CHARGES 0000064437 38.69 CREDIT CARD FEES
PARK RECREATION BANK CHARGES 0000064437 10.00 CREDIT CARD FEES
PARK RECREATION BANK CHARGES 0000064437 78.70 CREDIT CARD FEES
PARK RECREATION BANK CHARGES 0000064437 21.75 CREDIT CARD FEES
POLICE BANK CHARGES 0000064437 18.62 CREDIT CARD FEES
FIRE BANK CHARGES 0000064437 23.65 CREDIT CARD FEES
WATER/BILLING BANK CHARGES 0000064437 15.68 CREDIT CARD FEES
SEWER/BILLING BANK CHARGES 0000064437 15.69 CREDIT CARD FEES
SANITATION FUND BANK CHARGES 0000064437 15.68 CREDIT CARD FEES
======================
TOTAL: 964.56
MOSES LAKE STEEL SUPPLY 00001268
ENGINEERING SMALL EQUIPMENT < $1000 0000064316 11.65 ENG SUPPLIES
DATE 11/21/12
TIME 09:16:58
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 8
XAPPRVD
NAME OF VENDOR
Department
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
MOSES LAKE STEEL SUPPLY
PARK RECREATION
STREET
WATER
SEWER
EQUIP RENTAL-OPERATI
MOUNTAIN PRESS
PARK RECREATION
00001268
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
OPERATING SUPPLIES
REPAIR AND MAINTENANCE SUPPL
REPAIR & MAlNT. EQUIP. (CONT
00007189
MUSEUM RESALE
NANCY CORTEZ/PETTY CASH FUND 00004997
STREET REGISTRATION & MEMBERSHIPS
EQUIP RENTAL-OPERATI OPERATING SUPPLIES
EQUIP RENTAL-OPERATI TRAVEL & SUBSISTENCE /NON-ED
EQUIP RENTAL-OPERATI LEASE PURCHASE DEFERRING TO
NORTH CENTRAL WASHINGTON FENCE 00006902
WATER REPAIR AND MAINTENANCE SUPPL
NORTHERN ENERGY 00005570
EQUIP RENTAL-OPERATI GAS -PROPANE-FUEL
NORTHWEST HOSE & FITTINGS
STORM WATER
OGDEN MURPHY WALLACE INC
LEGAL/JUDICIAL
OXARC INC
SEWER
PARAMOUNT CAFE & CATERING
00001302
REPAIR AND MAINTENANCE SUPPL
00006727
PROFESSIONAL SERVICES
00001412
OPERATING SUPPLIES
00004939
GRANTS AND DONATIONS TRAVEL & SUBSISTENCE /NON-ED
0000064460 46.56 MISC SUPPLIES
0000064365 54.71 MISC SUPPLIES
0000064365 733 .49 MISC SUPPLIES
0000064365 17 .5 0 MISC SUPPLIES
0000064365 8.09 MISC SUPPLIES
======================
TOTAL: 872.00
0000064459 59.40 MAC RESALE
======================
TOTAL: 59.40
0000064371 10.00 REIMB PETTY CASH
0000064371 12.00 REIMB PETTY CASH
0000064371 11.51 REIMB PETTY CASH
0000064371 25.75 REIMB PETTY CASH
======================
TOTAL: 59.26
0000064374 85.89 ALUM TIES/FENCE REPAIR
======================
TOTAL: 85 .89
0000064370 11.60 PROPANE
======================
TOTAL: 11.60
0000064373 3.50 STEEL
======================
TOTAL: 3.50
0000064432 723.50 PROF SERVICE/AT & T REFUND
TOTAL: 723.50
0000064368 22.55 ORANGE SWEATSHIRT
======================
TOTAL: 22.55
0000064395 426.03 MEALS
DATE 11/21/12
TIME 09 :16:58
NAME OF VENDOR
Department
PHILIPS MEDICAL SYSTEMS
AMBULANCE SERVICE
PITNEY BOWES INC
CENTRAL SERVICES
POLHAMUS HEATING & AIR
SEWER
POW CONTRACTING
WATER SEWER CONSTRUC
PROGRESSIVE MEDICAL INTL
AMBULANCE SERVICE
QUILL CORPORATION
FINANCE
COMMUNITY DEVELOPMEN
POLICE
WATER/BILLING
RAINBOW FLYING SERVICE
AIRPORT
REDFLEX TRAFFIC SYSTEMS
POLICE
SAMARITAN HEAL THCARE
AMBULANCE SERVICE
PAGE 9
XAPPRVD
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
VENDOR NO
Object Description
Expenditure Account
00004166
REPAIR & MAINT . EQUIP. (CONT
00001508
OPERATING SUPPLIES
00006537
REPAIR & MAINT. EQUIP. (CONT
00005344
CIP·WATER PROJECTS
00006656
OPERATING SUPPLIES
00004811
OPERATING SUPPLIES
OPERATING SUPPLIES
OPERATING SUPPLI ES
OPERATING SUPPLIES
00003974
P.O. Number P.O. Amount Purpose of Purchase
======================
TOTAL: 426.03
0000064427 414.00 ALS MONITOR
======================
TOTAL: 414.00
0000064446 129.45 POSTAGE MACH INK
TOTAL: 129.45
0000064376 1,831.07 INSTALL HEAT PUMP
======================
TOTAL: 1,831.07
0000064417 5,395.00 FINAL PE WELL 11&24 PMPHSE 11
======================
TOTAL: 5,395.00
0000064424 1,048.42 AMBULANCE SUPPLIES
======================
TOTAL: 1,048.42
0000064434 51. 77 MISC SUPPLIES
0000064322 236.17 CALENDARS 2013
0000064388 114.30 SUPPLIES
0000064434 40.49 MISC SUPPLIES
======================
TOTAL: 482.73
REPAIR & MAINT. OTHER (CONTR 0000064377 300.00 LAWN CARE CONTRACT
00004837
PROFESSIONAL SERVICES
00001836
OPERATING SUPPLIES
======================
TOTAL: 300.00
0000064444 27,024.77 PROF SERV/RED LIGHT TICKETS
======================
TOTAL: 27,024.77
0000064429 68.07 AMBULANCE SUPPLIES
======================
TOTAL: 68.07
SAN DIEGO POLICE EQUIPMENT 00007332
GRANTS AND DONATIONS MINOR EQUIPMENT < $5000 000006 4397 406.58 AMMUNITION
======================
TOTAL: 406.58
DATE 11/21/12
TIME 09 :16:58
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 10
XAPPRVD
VENDOR NO
Object Description P.O. Number P.O. Amount Purpose of Purchase
=======================================================================================================================
00002995 SEATTLE PUMP COMPANY INC
SEWER REPAIR AND MAINTENANCE SUPPL 0000064378 2,060.48 JET NOZZLE
======================
TOTAL: 2,060.48
00005589 SHELLY MCCUISTION
FIRE TRAVEL & SUBSISTENCE /NON-ED 0000064428 20.16 REIMB MILEAGE
SHIRTBUILDERS INC
PARK RECREATION
SOL8 PERFORMANCE
POLICE
SPECTRUM COMMUNICATIONS
00004022
OPERATING SUPPLIES
00004568
OPERATING SUPPLIES
0000269l
EQUIP RENTAL-OPERATI REPAIR & MAINT. EQUIP. (CONT
SUNTRUST 00007361
EQUIPMENT LEASES PRINCIPAL CAPITAL LEASE
EQUIPMENT LEASES INTEREST ON CAPITAL LEASES/I
W/S LEASES PRINCIPAL CAPITAL LEASE
W/S LEASES INTEREST ON CAPITAL LEASES/I
EQUIP RENTAL-DEBT SR PRINCIPAL CAPITAL LEASE
EQUIP RENTAL-DEBT SR INTEREST ON CAPITAL LEASES/I
TAP-RACK TACTICAL LLC 00006176
GRANTS AND DONATIONS REGISTRATION & MEMBERSHIPS
TATUM LAWN CARE
WATER
TIFFANY QUILTER
MISC. SERVICES
00005928
REPAIR & MAINT. OTHER (CONTR
00005267
PROFESSIONAL SERVICES
UTIL UNDRGRND LOCATION CENTER 00004598
STREET MISCELLANEOUS (NOT LISTED BE
======================
TOTAL: 20.16
0000064315 312.65 ADULT SPORTS SHIRTS
======================
TOTAL: 312.65
0000064398 194.22 UNIPORMS
======================
TOTAL: 194.22
0000064379 3,092.25 REPAIR RADIOS
=================:===:
TOTAL: 3,092.25
000006393 3 317.l4 #35 LEASE PYMT/DEC
0000063933 10.77 #35 LEASE PYMT/DEC
0000063933 3,394.83 #35 LEASE PYMT/DEC
0000063933 158.66 #35 LEASE PYMT/DEC
0000063933 9,420.45 #35 LEASE PYMT/DEC
0000063933 276.40 #35 LEASE PYMT/DEC
===========:==========
TOTAL: 13,578.25
0000064394 700.00 REGISTRATION
======================
TOTAL: 700.00
000006 4380 377.65 EXCAVATE WATER METER
======================
TOTAL: 377.65
000006 4433 160.00 WELLNESS EXERCISE WRKSHOP
====================:=
TOTAL: 160.00
0000064381 60.48 UTILITY LOCATES
DATE 11/21/12
TIME 09:16:58
NAME OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 11
XAPPRVD
VENDOR NO
Object Description P,O, Number P,O, Amount Purpose of Purchase
========:=====================================:=:======================================================================
UTIL UNDRGRND LOCATION CENTER 00004598
WATER
SEWER
MISCELLANEOUS (NOT LISTED BE 0000064381 60,48 UTILITY LOCATES
MISCELLANEOUS (NOT LISTED BE 0000064381 60,48 UTILITY LOCATES
UV DOCTOR LAMPS LLC
SEWER
VERIZON WIRELESS
AMBULANCE SERVICE
00006326
OPERATING SUPPLIES
00002107
TELEPHONE
00005609
======================
TOTAL: 181.44
0000064383 420,81 LAMP DISPOSAL BOX
TOTAL: 420 ,81
0000064447 242,88 MNTHLY ACCESS CHARGES
======================
TOTAL: 242,88
W ROBERT TAYLOR
FINANCE TRAVEL & SUBSISTENCE /NON-ED 0000064436 119,29 REIMB MILEAGE/EXPENSES
WASHINGTON AUTO CARRIAGE 00007724
EQUIP RENTAL-OPERATI LEASE PURCHASE DEFERRING TO
WEAVER EXTERMINATING SERVICE
WATER
WENATCHEE VALLEY COLLEGE
POLICE
WENATCHEE VALLEY MEDICAL CTR
00004290
PROFESSIONAL SERVICES
00007670
REGISTRATION & MEMBERSHIPS
00005069
STREET PROFESSIONAL SERVICES
SEWER PROFESSIONAL SERVICES
EQUIP RENTAL-OPERATI PROFESSIONAL SERVICES
00004968
======================
TOTAL: 119,29
0000063577 14,946,25 WAUSAU SERIES SNOW PLOW
======================
TOTAL:
0000064384
TOTAL:
0000064389
TOTAL:
0000064430
0000064430
0000064430
14,946,25
69,06
69.06
2,000.00
2,000.00
80.00
80.00
80.00
RODENT CONTROL
REGISTRATION
DOT PHYSICALS
DOT PHYSICALS
DOT PHYSICALS
======================
TOTAL: 240.00
WEST PAYMENT CENTER
LEGAL/JUDICIAL BOOKS /LESS $100.00 TOTAL VA 0000064466 931.18 LEGAL BOOKS
TOTAL: 931.18
WESTERN PETERBILT INC 00006802
EQUIP RENTAL-OPERATI REPAIR & MAINT. EQUIP, (CONT 0000064385 364. 03 REBUILD AIR DRYER
WILLARD SELF
POLICE
00005350
DIRECT MEDICAL PAYMENTS
======================
TOTAL: 364.03
0000064454 183.50 PRESC CO-PAY
DATE 11/21/12
TIME 09:16:58
NANE OF VENDOR
Department
CIT Y 0 F M 0 S E S L A K E
TAB U L A T ION 0 F C L A I M S T 0 B E A P PRO V E D
C 0 U N C I L M E E TIN G 0 F
11/27/2012
Expenditure Account
PAGE 12
XAPPRVD
VENDOR NO
Object Description P.O . Number P.O. Amount Purpose of Purchase
=======================================================================================================================
XPRESS BILL PAY -EFT
WATER/BILLING
SEWER/BILLING
SANITATION FUND
00006421
BANK CHARGES
BANK CHARGES
BANK CHARGES
======================
TOTAL:
0000064440
0000064440
0000064440
TOTAL:
183.50
376.83
376.82
376.83
1,130.48
CREDIT CARD FEES
CREDIT CARD FEES
CREDIT CARD FEES
======================
REPORT TOTAL: 924,352.89
DATE 11/21/12
TIME 09,17,01
TOTALS BY FUND
FUND NO
---------
000
102
103
116
275
284
410
477
483
490
493
495
498
517
519
528
611
CITY OF MOSES LAKE
TABULATION OF CLAIMS TO BE APPROVED
COUNCIL MEETING OF
11/27/2012
FUND NAME AMOUNT
----------------------------------------------------
GENERAL FUND 43,523 .99
TOURISM ACTIVITIES 13,674 .94
GRANTS AND DONATIONS 1,532.61
STREET 1,060.52
EQUIPMENT LEASES 327.91
1998 REFUNDING GOB 275.70
WATER/SEWER 14,497 .52
WATER SEWER CONSTRUCTION 5,395 .00
W/S LEASES 3,553.49
SANITATION FUND 182,632.27
STORM WATER 125.65
AIRPORT 300.00
AMEULANCE SERVICE FUND 2,468 .82
CENTRAL SERVICES 1,791.35
EQUIPMENT RENTAL 32,894.35
BUILD MAINTENANCE 616,698.77
FIREMANS PENSION 3,600.00
TOTALS PAGE
XAPPRVD
DATE 11/21/12
TIME 09:17:01
CITY OF MOSES LAKE
TABULATION OF CLAIMS TO BE APPROVED
TOTALS BY FUND
FUND NO FUND NAME
TOTAL
CHANGES TO BE MADE SHOULD BE LISTED BELOW
COUNCIL MEETING OF
11/27/2012
AMOUNT
924,352 .89
VEND NO. P.O. NO. AMT LISTED CORRECTED AMT ACTION TO BE TAKEN
CORRECT AMOUNT TO BE PAID
TOTALS PAGE
XAPPRVD
** * .. * * * * .. * * * * * * .. * .. * * * * * * * * * * .... * * * * * * .. * i*
* *
* CLAIMS APPROVAL *
* * * WE, THE UNDERSIGNED COUNCILMEN OF THE CITY OF MOSES LAKE, WASHINGTON, DO HEREBY CERTIFY THAT THE MERCHANOISE *
* OR SERVICES SPECIFIED HAVE BEEN RECEIVED AND THAT ABOVE CLAIMS ARE APPROVED, AS NOTED, FOR PAYMENT *
* IN THE AMOUNT OF $924,352.89 THIS 27TH DAY OF NOVEMBER, 2012 *
* *
* *
* COUNCIL MEMBER
*
*
* * COUNCIL MEMBER
COUNCIL MEMBER
FINANCE DIRECTOR
*
*
*
*
** * * .. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
November 20, 2012
TO: City Manager
For City Council Consideration
FROM: Municipal Services Director
SUBJECT: Accept Work
Wastewater Telemetry Project -2012
Inland Northwest Electric has completed work for the Wastewater Telemetry Project -2012.
That project included installing new radios, controllers, and interface units for 24 lift stations;
upgrades to the remote telemetry units and radios for the Larson and Sand Dunes wastewater
treatment plants; and supervisory control and data acquisition programing at the Central
Operations Facility.
The contract was awarded in the amount of $186,799. The final contract amount for the work is
$198,447. The additional cost is accounted to change orders for auxiliary parts that were required
to be replaced for compatibility with the new controllers at a few lift stations.
The contract work is physically complete and ready for acceptance by City Council. Upon
acceptance of the contract, we will enter into the 60-day lien period as required by Washington
State Law.
Respectfully Submitted, ~
:-~~ ~
Municipal Services Director
November 16,2012
Moses Lake City Council Members,
The Moses Lake Public Library Foundation will be coming before you at the November 27th council
meeting to ask for your endorsement of its proposal to remodel and expand the public library building.
Your support is vitally important as we begin the fund raising phase of the project. Major donors are
unlikely to commit funds to a project that may not happen. With your help we can move this project a
major step closer to fruition.
The project has come a long way since the idea of addressing the problems with our public library was
brought up in 2006. With ongoing input from the community and recommendations from the
architectural firms that vied to develop the concept design, each with extensive experience in library
deSign, the proposal morphed from the idea of an entirely new building to keeping this beloved and
architecturally unique building in its current location and instead performing a major remodel and
expansion.
With the assistance of the City Council a significant amount of preparation has already occurred. The
building has been evaluated (see MLPL Building Analysis -Mech-Electrical and Structural files). concept
designs have been created (see MLPLF Basic Concept Design Drawing additional, image are available at
www.mlpltorq ). and cost projections have been developed (see MLPLF Project Cost l -Memo, 2-Briej, 3-
Full). While the estimated cost of the project was at first dismaying, the foundation is confident that, in
typical Moses Lake fashion, ways can be found to lower the cost and bring in the funds needed to make
it happen. This may mean modifying the design slightly or phasing the project, but the ultimate goal is
the same, to provide Moses Lake and the surrounding community with a public library we can all be
proud of and will serve current and future users well for many years to come.
Shortly after the Foundation's meeting with Mayor Ecret in late October we began gathering signatures
and so liciting letters of support from community members, organizations, and businesses interested in
seeing this project more forward. (see MLPLF letter request) To date we have over 600 signatures and
will provide the council with the complete list at the meeting on the 27th•
Thank you for taking time to address this important aspect of life here in Moses Lake. I look forward to
speaking with you.
Yours,
Tim Fuhrman
President
Moses Lake Public Library Foundation
Moses Lake City Library
Moses Lake, WA
Mechanical and Electrical Systems
Analysis of Existing Conditions
MW mechanical and electrical engineers visited the Moses Lake City Library in February of 2010. The
purpose of the visit was to assess the current condition of these systems and their suitability to
adequately serve the facility in both the short and long term. This analysis also considered the planned
future renovation and expansion of the Library.
Mechanical
Description of Existing Systems:
The Moses Lake City Library is approximately 40-45 years old. The majority of the heating ventilating
and air condiUoning (HVAC) and plumbing systems were installed at the time of the original
construction. The average economic life of the type of mechanical systems installed in this building is
in the range of 15-20 years.
The HVAC systems consist of two small air handling units located within a basement mechanical room.
Each of these units has a direct expansion cooling coil and an electric heaUng coil. The cooling coils
are connected to remote air cooled condensing units located on the roof. These rooftop condensing
units are not original having been replaced approximately 20 years ago. A third small air handling unit
also located within the basement mechanical room is not operational leaving the rooms in the
basement of the Library without any ventilation, heating or cooling.
The remaining air handling units serve the open library areas on the main floor. Air to these areas is
distributed via under floor ductwork that connects to perimeter sill and floor grilles. Controls consist of
electric thermostats.
Plumbing systems are of original vintage. Waste and vent piping appears to be of cast iron and copper.
Domestic water is galvanized steel. Plumbing fixtures are enameled steel or cast iron. The center roof is
drained via an internal roof drain. The flat roofs are drained by roof drains that run in outside walls and
"daylight" near the ground (See Figure 1). Drainage from basement toilet rooms, cooling coil
condensate, fire and domestic piping goes to a simplex sewage ejector (See Figure 2).
The basement is fully fire sprinkled. The remaining building does not have fire sprinkling.
2009.008.01 MEP Narrative.doc
1
Moses Lake City Library
Moses Lake, WA
System Deficiencies
Analysis of Existing Conditions
The HVAC systems that currently serve the Library have exceeded their economic life. These systems
are old, worn, outdated and require excessive maintenance. In addition, replacement parts are difficult
to find , thermal zoning is poor and the systems are energy inefficient.
Building plumbing systems are similar to the HVAC systems in having outlived their economic life.
Fixtures are old and do not meet ADA requirements. Roof drain piping located within outside walls and
daylight at the ground regularly freeze with corresponding water backup to the roof. Condition of
plumbing is generally unknown although maintenance personnel indicated some problems with waste
and vent piping.
It should be noted that the possibility of asbestos may exist within the existing piping insulation.
Maintenance personnel did not know if an asbestos survey had been previously completed.
Maintenance personnel indicated the existing HVAC system "struggles" to maintain proper space
conditions due to age, capacity, and a poor thermal building envelope. It was apparent that the airflow
in the large open spaces was marginal.
Recommendations:
A major renovation and expansion program for the Moses Lake City Library should consider the
following mechanical system approach:
a. The majority of the existing building HVAC systems should be replaced . In addition, major
modifications to the existing plumbing systems are required including roof drainage systems and
plumbing fixture replacement due to age and ADA non compliance.
b. Portions of the existing systems may be able to be reused such as piping, ductwork, and
basement fire sprinkling. This will have to be considered on a case by case basis.
c. The existing mechanical room has a good size and generous ceiling heights that make it a good
candidate for reuse. A potential drawback is limited access due to 3 ft. doors.
d. The development of a common HVAC approach for the entire facility.
e. Sustainable designs that incorporate a high degree of energy efficiency including the
consideration if variable flow refrigerant "heat pump" systems, appropriate air distribution to
promote good air quality while respecting the acoustical demands of the library environment,
high quality equipment with long service lives to reduce maintenance, and integrated design
approaches to ensure all the building systems (both static and dynamic) are mutually supportive
to the greatest extent possible.
f. Selection of equipment and temperature control systems that are compatible with other recently
constructed City facilities and applicable construction standards.
g. New fire sprinkler systems throughout the renovation and expansion.
h. Consolidation of common elements between the new and existing construction such as water
and fire service, primary heating and cooling eqUipment, etc.
In summation , the mechanical system design for the renovation and expansion of the Moses Lake City
Library should incorporate a Single, common HVAC system that includes the replacement of an aged
existing system that is beyond its economic life. In addition, new plumbing and fire protection systems
are required for the entire facility.
2009.008.01 MEP Narrative.doc
2
Moses Lake City Library
Moses Lake, WA
Electrical
Description of Existing Systems:
Analysis of Existing Conditions
Field investigation confirms that electrical distribution equipment installed with the original construction,
approximately 40-45 years ago, remains in service. While generally in good condition, the average
service life for this type of equipment would range from 25-30 years. Obsolescence and availability of
spare parts should be considered in the evaluation of the serviceability of this equipment.
UTIlization voltage is supplied by a Grant Co. PUD owned 225 KVA pad mount transformer (#T21439)
at 208Y/120V (See Figure 3). Watt-hour demand meter (#37998) is mounted to side of the
transformer enclosure. The maximum demand reading was recorded at 0.633 x 120 multiplier =
75.96 KW. Underground service entrance conductors (3 Sets 4#500) enter the building below the
main switchboard located in the basement.
The main service switchboard (Square D Job #S442409SE) is rated at 1000A with a 3P-1000A main
circuit breaker. A 12-pole NOOB panel board is integrally-mounted in the switchboard enclosure ahead
of the main circuit breaker for "emergency" loads. Distribution branch/feeder breakers are as follows:
(4) 3P-200A, (1) spare
(5) 3P-1 OOA
(1) 3P-70A
(3) 3P-40A
(3) 3P-30A
(3) 3P-15A
Branch circuit panels (Square D NOOB type) are located in the both basement mechanical room as well
as main floor work room (See Figure 4). A minimum number of flush floor boxes were anticipated in the
original construction. Subsequent efforts to accommodate personal computers has revealed that
limited space is available within branch circuit raceways particularly from Panel 'A-1', 'A-2', and 'A-3'
to the stacks and central reference areas.
2009.008.01 MEP NarraUve .doc
3
Moses Lake City Library
Moses Lake, WA
Figure 4 -Branch Circuit Panels 'A-l, 'A-2', and 'A-3 '
Analysis of Existing Conditions
Lighting fixtures and control remains largely unchanged since original construction. The primary fixture
type is 2'x4' troffer style utilizing T12 fluorescent lamps. Other fixture types are utilized including track
lighting in the basement Auditorium. Pendant mounted fixtures in the stacks and central reference
areas have been retrofitted to T8 lamp technology. Lighting in the Book Mobile/Storage Garage is
inferior. Exterior lighting consists of utilitarian wall pack fixtures.
Absent an emergency generator there is minimal use of battery back-up for emergency power source
for illumination of Means of Egress. Where provided, stand alone emergency lighting units with integral
battery back-up has been utilized. No illumination has been provided where exits discharge from the
building to the public right-of-way.
Lighting controls for the main floor stacks and central reference area consist of (5) lighting contactors
mounted in a recessed enclosure in located in the Work Area (See Figure 5). Line voltage switch legs
control the operation of these contactors. All other areas are control by line voltage toggle switches.
There does not appear to be any automatic lighting shut-off control or daylight switching capability.
/
Figure 5 -Lighting Contactors
Telephony services enter the building through a 1-1/2" conduit terminating in a hinged cover cabinet
located in the basement mechanical room. The original construction anticipated limited need for
telephone wining. Only (8) 1" conduits extend from the telephone backboard to floor boxes and wall
2009.008.01 MEP Narrative.doc
4
Moses Lake City Library
Moses Lake, WA
Analysis of Existing Conditions
phone locations throughout the building. In an effort to adapt to ever changing telecommunications
needs, the Owner has installed exposed station cables.
Fire alarm system is of the conventional zoned type and as such has limited capacity to accommodate
expansion.
System Deficiencies
Main service switchboard may not have adequate spare capacity or physical space to accommodate
additional loads and feeder devices associated with a major renovation and addition project. It was
observed that piping systems pass directly above this switchboard in violation of NEC 110.26 (F). This
code violation will require remedy or variance prior installation of a new service at this location.
Branch circuit raceways to the stacks and central reference areas are inadequate to support power
densities and quantity of personal computers found in a modern building environment. Similarly,
telecommunication infrastructure is not adequate to support port densities required by the quantity of
personal computers found in modern building environment.
The lighting systems utilize inefficient and obsolete lamp technology which wastes energy and provides
illumination with inferior color-rendition. The lighting control system does not provide automatic shutoff
or adequate local control of daylight zones.
The fire alarm system, being a conventional zoned type, likely has inadequate capacity to support code
required initiating (heat and smoke detectors) and audible/Visual notification appliances (horns and
strobe lights) and the associated power supplies.
Recommendations:
A major renovation and expansion program for the Moses Lake City Library should consider the
following electrical system approach:
a. Consideration should be given to replacing the existing electrical service and distribution
equipment including service switchboard and branch circuit panels. Additional branch panels
will be required to accommodate the proposed addition. To the extent pOSSible, existing
equipment locations and feeders should be maintained.
2009.008.01 MEP Narrative.doc
5
Moses Lake City Library
Moses Lake, WA
Analysis of Existing Conditions
b. An NEC 700 compliant emergency power system consisting of an emergency generator, transfer
equipment and branch circuit panel should be installed for the supply of life safety systems
loads.
c. Replace as necessary snow-melting and de-icing cable systems.
d. Lighting fixtures throughout the building should be replaced with fixtures utilizing energy efficient
lamp and ballast technology as well as superior photometric control characteristics.
e. The existing lighting control system should be replaced with a centralized low-voltage relay-
based lighting control panel incorporating automatic shut-off and daylight harvesting capabilities.
Occupancy sensor based lighting controls should be provided in smaller rooms where relay-
based control is not appropriate.
f. Telecommunications infrastructure should be replaced to provide adequate dedicated equipment
space, wiring closets , horizontal workstation cabling pathways, and a structured cabling system
with minimum CAT 6 performance. Additionally , infrastructure to support wireless access pOints
in the stacks area are required.
g. Replace the existing fire alarm system with an addressable type.
Finally, the electrical system design for the renovation and expansion of the Moses Lake City Library
should provide sufficient capacity to support anticipated and future loads, provide flexibility to adapt to
ever changing modern building environment, and incorporate replacement of aged technologies
including lighting and controls, structured cabling and fire alarm systems for the entire facility.
2009.008.01 MEP Narrative.doc
6
April 8, 2010
QUANTUM
STRUCTURAL ASSESSMENT REPORT
MOSES LAKE COMMUNITY LIBRARY
418 East Fifth Avenue
Moses Lake, WA
Quantum Job Number: 10029.01
Prepared for:
MILLER HULL PARTNERSHIP
71 Columbia Street, Suite 600
Seattle, WA 98104
Prepared by:
QUANTUM CONSULTING ENGINEERS
1511 Third Avenue, Suite 323
Seattle, WA 98101
TEL 206.957.3900
l. I nt/Oduction
PURPOSE
This report was authorized by The Miller-Hull Partnership for the City of Moses Lake Community
Library. The purpose of this report is to provide a structural evaluation of the Library building
located at 418 East 5~ Avenue, in Moses Lake, Washington. This evaluation was to identify
structural deficiencies with respect to the potential additions to the Library. Where applicable,
we recommend conceptual methods to improve these deficiencies.
SCOPE OF WORK
The work for this evaluation included the following tasks:
• Visit the site to become familiar with the existing conditions of the structure, and note
variations from available drawings. Our site visit was on February 22,2010.
• Perform a structural analysis of the building based upon ASCE 31 evaluation. guidelines,
entitled "Seismic Evaluation of Existing Buildings." Refer to Appendix 'B' for an
explanation of the ASCE 31 evaluation methodology.
• Provide a summary of our findings.
• Provide gUidelines on addressing deficiencies with regard to the conceptual Library
expansion .
The opinions and recommendations presented in this report were developed with the care
commonly used in the practice of this profession. No other warranties are included, either
expressed or implied, as to the professional advice contained herein.
2 . Building Assessment & Recommendations
This section of the report summarizes the methodology and results of the structural evaluation of
the Moses lake Community library. The evaluation methodology includes a review of the
available construction drawings, a site visit, and preliminary screening of structural features.
Conceptual strengthening approaches for deficiencies identified in the building are presented.
DESCRIPTION OF STRUCTURAL SYSTEM
The library Building is unique structure, built circa 1965. It is a single story plus a partial
basement, located on a flat site. In plan, the building is a cruciform shape comprising roughly
7,000 square feet plus the partial basement which encompasses about 3,000 square feet.
The roof is composed of two structural systems: the building center's roof is reinforced concrete
in the shape of a hyperbolic paraboloid, which is approximately square in plan view. The roof
slab is 3-1/2" thick, spanning to reinforced concrete beams on all sides, supported by a center
reinforced concrete cruciform column and corner steel wide flange columns. Beyond this high
roof system are four low roof areas, forming a cruciform shape in plan view. These structures
consist of metal deck supported by open web steel jOists, supported by 8" thick reinforced
masonry walls.
The building's lateral force-resisting system is composed of the concrete and metal deck
diaphragms collecting and transferring load to the reinforced masonry walls . The foundation
system is composed of conventional shallow spread and continuous reinforced concrete footings.
The partial basement is composed of reinforced concrete retaining walls, with a concrete slab-on-
grade floor and a 12" thick concrete slab floor above, forming a portion of the main level floor.
, "
. " ..
. '
", !
i ", ." .
. ,". I i . "." ,~.~;<~.: ",:
.;:\~j':.:.': :~
. ,.;
Figure 1: Structural roof plan
BUILDING EVALUATION
The Moses Lake Library was evaluated using an ASCE-31 Tier 1 evaluation. This evaluation was
conducted for a Life Safety performance level. The building location has been assigned as a
"Moderate' seismicity region.
The Tier 1 checklist was completed based on a site visit, a review of the structural drawings, and
basic calculations. The Tier 1 checklist is provided in Appendix A. Deficiencies were identified
and are summarized in the following paragraphs.
The pseudo lateral force used in this evaluation was determined in accordance with ACSE-31 for
a building type RM-l (reinforced masonry shear wall buildings with flexible diaphragms). The
building was therefore analyzed in north-south and east-west directions to calculate diaphragm,
connection, and wall forces based on the following formula.
V = C S, W = (1.0) (0.43) W = 0.43 W
Our site observations of the Library revealed that it has been well-maintained. There were no
significant areas of structural distress observed. Additionally, based on the Tier 1 evaluation and
calculations of the elements shown in the original construction drawings, the building meets the
following ASCE-31 acceptance criteria for the Life Safety performance level:
• The structure contains a complete load path for lateral loads.
• The roof structure is anchored to the lateral-foree-resisting elements of the main
structure.
• The building geometry in both plan and vertical continuity is regular without significant
discontinuities.
• There are no visible signs of structural distress or deterioration of masonry and concrete
elements.
• The number of shear walls in each direction is greater than or equal to 2.
• The shear stress in the concrete panels calculated using the quick check procedure is
within allowable limits.
• The masonry walls are reinforced with the minimum steel-to-concrete ratio percentage
specified in the quick check list.
• The masonry walls are doweled into the foundation.
• Main building beams and girders are positively connected to the columns and supporting
walls for both out-of-plane and in-plane lateral forces.
• Gravity framing appears to be sufficient and appears to be in good condition. In 1997,
this structure likely experienced design level roof snow loading, and apparently no
damage was reported.
Based on the original design drawings, however, we did find some structural items that would not
meet current code and could lead to additional damage in a design-based earthquake. These
structural deficiencies are itemized and discussed below.
1. The concrete beams and columns supporting the concrete roof have shear ties that do not
meet the minimum steel requirement of current codes. This lack of concrete
confinement can lead to additional damage to the beams in a design level earthquake.
2. The perimeter wall between the masonry walls on all four ends is composed of a series of
steel tube posts with infill clerestory glass and lightweight steel insulated panels (see
Figure 2). This assembly has minimal shear resistance capacity, but will attract seismic
load due to the flexible roof diaphragm above. This will lead to a large amount of racking
of these walls, leading to glass breakage.
Figure 2: End walls
RECOMMENDATIONS WITH RESPECT TO CONCEPTUAL BUILDING EXPANSION
We are in receipt of a concept for expanding the Library (see Figure 3).
,
Figure 3-Concept for Library Expansion
,.
" ( r
(. \ "," " l~~~ ,
"'/" I, •. -'
'/")
~
Structurally, we will want to use the expansion to address the building's deficiencies, listed
above. Most notably, we will want to introduce lateral elements to the glass ends of the building
with steel moment-resisting frames, or other elements. Regarding the insufficient lateral shear
ties, we will consider using Fiberwrap to encase the beams and center column. This product is
a very thin carbon fiber sheet product applied with an epoxy coating. It will not alter the
dimensions of the elements, and is paintable.
CONCLUSIONS
Based on our structural assessment of the Moses Lake Library, we believe the building was
designed to comply with, and in some areas, exceed the building code structural requirements
in effect at the time of construclion. However, lesions learned from recent earthquakes have
made current buildings codes more stringent, and as a result, the Library has important
deficiencies when evaluated with current design standards. The lack of concrete shear
confinement in the beams and center column, and low stiffness of the outer window walls will
lead to potentially significant levels of structural and nonstructural damage in a design level
earthquake event. The expansion project will allow an opportunity to address these deficiencies
without materially impacting the current elements of the building that are to remain.
-. APi" EN D' 'X A-
QUANTUM CONSULTING ENGINEERS
Building Name: ___ tY)="'""~"f"<,--"L.,=,,,, ........... -,,L,",,,c,21!;;:"''''o,,-,-,;,,,~"'1----------Date: --'~.L~-'-1'--"'1 ... 0"-____ _
Building Address: ____ 4ul""t$'--"t::.=--:.. --"$,--IL1",-"--,A-".,-,/~"'-Cif-Jt",11",,,, ... ~,,-, --,'-"=>U=+-I ",W,,-A-,-_ Page: _-'-_ of 2
Job Number: '0",<"7." I Job Name: __________ ___ By: ../I/..J Checked: __ _
ASCE 31 BASIC CHECKLIST RM1: REINFORCED MASONRY BEARING WALL
BUILDINGS WITH FLEXIBLE DIAPHRAGMS
c NC N/A Comments
BUILDING SYSTEM
18I D D 4.3.1.1 LOAD PATH: The structure shall contain a minimum of one
complete load path for life Safety and Immediate Occupancy for
seIsmic force effects from any horizontal direction that selVes to
transfer the inertial forces from the mass to the foundation.
~ D D 4.3.1.2 ADJACENT BUILDINGS: The clear distance between the building
being evaluated and any adjacent building shall be greater than 4%
of the height of the shorter building for Ufe Safety and Immediate
Occupancy.
D D 1)9 4.3.1.3 MEZZANINES: Interior mezzanine levels shall be braced
independently from the main structure, or shall be anchored to the
lateral-force-resrstlng elements of the main structure.
D D ~ 4.3.2.1 WEAK STORY: The strength of the ratarar-foree-resisting system in
any story shaH not be loss than 80% of the strength in an adjacent
story above or below for Life-Safety and Immediate Occupancy.
[J 0 12g 4.3.2.2 SOFT STORY; The stiffness of the Jateral·force-reslsting-system in
any stol)' shall not be less than 70% of the lateral-farce-resisting
system stiffness in an adjacent story above or below, or less than
80% of the average lalefal-force·reslstlng system stiffness of the
three slories above or below for Life Safety and Immediate
Occupancy.
D D ~ 4.3.2.3 GEOMETRY: There shall be no changes in horizontal dimension of
the lateral-foree·resisting system of more than 30% in a slory
relative to adjacent stories for Ufe Safety and Immediate
Occupancy, excluding one-story penthouses and mezzanines.
181 D 0 4.3.2.4 VERTICAL DISCONTINUITIES: All vertical elements in the fateral-
force-resisting system shall be continuous to the foundation.
D D ~ 4.3.2.5 MASS; There shall be no change In effective mass of more than
50% from one story to the next for Ufe Safety and Immediate
Occupancy. Ught roofs , penthouses and mezzanines need not be
consIdered.
0 D El 4.3.3.1 DETERIORATION OF WOOD: There shall be no signs of decay,
shrinkage, splitting, fire damage, or sagging in any of the wood
members and none of the metal connection hardware shall be
deteriorated, broken, or loose.
181 D D 4.3.3.7 MASONRY UNITS; There shall be no visible deterioration of
masonry units.
~ 0 D 4.3.3.8 MASONRY JOINTS: The mortar shall not be easily scraped away
from the jOints by hend with a metel tool, and there shall be no
areas of eroded mortar.
~ D 0 4.3.3.10 REINFORCED MASONRY WALL CRACKS: All existing diagonal
cracks rn wall elements shall be less than tl8" for Ute Safety and
1116" for Imm\\diate Occupancy, shall not be concentrated in one
location, and.;,$hall not form an X pattern.
QUANTUM CONSULTING ENGINEERS
Building Name: ______________________ _ Date: _________ _
Building Address: ______________________ _ Page: _-,,2_ of 2
Job Number: Job Name: By: Checked: __ _
ASCE 31 BASIC CHECKLIST RM1: REINFORCED MASONRY BEARING WALL
c NC N/A
~ 0 0
)5j. 0 0
;g) 0 0
(it! 0 0
0 0 r».
'Rl 0 0
'Ii/l 0 0
o 0 b<i
BUILDINGS WITH FLEXIBLE DIAPHRAGMS
LATERAL·FORCE·RESISTING SYSTEM
4.4.2.1.1 REDUNDANCY: The number of flnes of shear walls in each
principal dIrection shall be greater than or equal to 2 for Life Safety
and Immediate Occupancy.
4.4.2.4.1 SHEAR STRESS CHECK: The shear stress in the r.inforced
masonry shear walls, calculated using the QuIck Check Procedure
of Section 3.5.3.3, shall be less than 70 psi for life Safety and
Immediate Occupancy.
4.4.2.4.2 REINFORCING STEEL: The tolal vertical and horizontal reinforcing
steel ratio in reinforced masonry walls shall be greater than 0.002
for life Safety and Immediate Occupancy of the wall with the
minimum of 0.0007 for LIfe Safety and Immediate Occupancy in
either of the two directions; the spacing of reinforcing steel shall be
less than 48" for Life Safety and Immediate Occupancy: and all
vertical bars shall extend 10 lhe top of the walls.
CONNECTIONS
4.6.1 .1 WALL ANCHORAGE: Exterior concrete or masonry walls, that are
dependent on the diaphragm for lateral support, shall be anchored
for out·of~plane forces at each diaphragm level with sleal anchors,
reinforcing dowels, or straps that are developed into the diaphragm.
Connections shall have adequate strength to resist the connection
force calculated in the Quick Check Procedure of Section 3.5.3.7.
4.6.1.2 WOOD LEDGERS: The connection between the wall panels and the
diaphragm shall not induce cross-grain bending or tension in the
wood ledgers.
4.6.2.1 TRANSFER TO SHEAR WALLS: Diaphragms shall be connected
for transfer of loads to the shear walls for Ufe Safety and the
connections shall be able to develop the lesser of the shear strength
of the walls or diaphragms for Immediate Occupancy.
4.6.3.5 FOUNDATION DOWELS: Wall reinforcement shall be doweled into
the foundation for Ufe Safety and Ihe dowels shall be able to
develop the lesser of the strength of the walls or the uplift capacity
of the foundation for Immediate Occupancy.
4.6.4.1 GIRDER/COLUMN CONNECTION: There shall be a posilive
connection utilizing plates, connection hardware, or straps between
the girder and the column support.
Comments
APPENDIX B: ASCE-31 Seismic Evaluation Methodology
This standard provides a process for seismic evaluation of existing buildings. It is intended to
serve as a nationally applicable tool for design professionals, code officials, and building owners
looking to seismically evaluate existing buildings. The evaluation procedure includes
consideration of ground shaking. The design level seismic event in this document is based on a
ground motion that has a 2% probability of being exceeded in 50 years, representing an
earthquake with a 2,475-year return period.
ASCE-31 presents a three-tier process for the seismic evaluation of existing buildings. Buildings
are evaluated to either the Life Safety or Immediate Occupancy Performance Level. The initial
tier begins with preliminary screening. The tiers increase in their level of detail and are engaged
based on the findings of the previous tier. Only Tier one was evaluated for the Library.
Tier 1
A Tier 1 evaluation is conducted for all buildings. This consists of screening and
preliminary simplified analyses to identify potential vulnerabilities in the building based
on performance of similar structures in past earthquakes. Existing structural drawings are
reviewed and a site visit is conducted. Checklists of evaluation statements are completed
to document the screening. The building is identified to be either compliant or
noncompliant with the evaluation statements. Fundamental to the Tier 1 analysis of
buildings is the grouping of buildings into sets that have similar behavioral
characteristics. These groups were first defined in ATC-14 and have been used in most of
the FEMA guideline documents since then. Because most structures are unique in some
fashion, judgment must be used when selecting the building type, with the focus on the
lateral-foree-resisting system and elements. The purpose of the Tier 1 checklists is to
identify potential weak links in structures that have been observed in past earthquakes.
Analyses performed as part of Tier 1 of the evaluation process are limited to Quick
Checks. Quick Checks are used to calculate the stiffness and strength of certain building
components to determine whether the building complies with certain evaluation criteria.
Different cheCklists are provided for various generic structure types. The completed
checklist for this bui Iding is included in Appendix A.
APPENDIX B: ASCE-31 Seismic Evaluation Methodology
This standard provides a process for seismic evaluation of existing buildings. It is intended to
serve as a nationally applicable tool for design professionals, code officials, and building owners
looking to seismically evaluate existing buildings. The evaluation procedure includes
consideration of ground shaking. The design level seismic event in this document is based on a
ground motion that has a 2% probability of being exceeded in 50 years, representing an
earthquake with a 2,475-year return period.
ASCE-31 presents a three-tier process for the seismic evaluation of existing buildings. Buildings
are evaluated to either the Life Safety or Immediate Occupancy Performance Level. The initial
tier begins with preliminary screening. The tiers increase in their level of detail and are engaged
based on the findings of the previous tier. Only Tier one was evaluated for the Library.
Tier 1
A Tier 1 evaluation is conducted for all buildings. This consists of screening and
preliminary simplified analyses to identify potential vulnerabilities in the building based
on performance of similar structures in past earthquakes. Existing structural drawings are
reviewed and a site visit is conducted. Checklists of evaluation statements are completed
to document the screening. The building is identified to be either compliant or
noncompliant with the evaluation statements. Fundamental to the Tier 1 analysis of
buildings is the grouping of buildings into sets that have similar behavioral
characteristics. These groups were first defined in ATC-14 and have been used in most of
the FEMA guideline documents since then . Because most structures are unique in some
fashion, judgment must be used when selecting the building type, with the focus on the
lateral-force-resisting system and elements. The purpose of the Tier 1 checklists is to
identity potential weak links in structures that have been observed in past earthquakes.
Analyses performed as part of Tier 1 of the evaluation process are limited to Quick
Checks. Qu ick Checks are used to calculate the stiffness and strength of certain building
components to determine whether the building complies with certain evaluation criteria.
Different checklists are provided for various generic structure types. The completed
checklist for this building is included in Appendix A.
MEMO
To:
From:
Date:
Subject:
Ruth Coates
The Miller Hull Partnership
Dave McGee
Roen Associates
August 26, 2010
Moses Lake Library
Draft Pre-design Estimate
R0EN
,lllaliIJTEB
Following are notes and comments concerning the draft pre-design estimate:
1. Separate estimates were prepared for the existing building main floor remodel,
building additions and sitework. Building square footages were adjusted to values
provided by the designer. Estimate takeoff quantities were proportionally adjusted to fit
the actual building square footage.
2. The estimate pricing assumes that the work will be competitively bid .
3. An estimating contingency of 15% has been used in the estimates, which is
appropriate for the current conceptual level of design completion.
4. Since the project bid date is unknown, escalation has been excluded from the
estimate. The construction market is currently excessively competitive, and it is unlikely
that any appreciable price escalation will occur in the near future. In normal market
conditions, an annual escalation rate of about 3% to 3.5% would be expected.
5. The estimate does not include "soft costs" such as design fees , permits, abatement,
construction change order contingencies, and loose fixtures or furnishings. Sales tax
has also not been included in the estimate.
6. It is likely that the existing building has materials that contain asbestos and
consideration should be given to budgeting an amount for abatement work.
7. It has been assumed that the work will be designed to LEED silver standards. To
cover related costs, a cost item has been included in the estimates equal to 3% of the
project direct cost.
8. It has been assumed that the bookmobile garage depression will be in-filled with
concrete structure to the main floor level.
9. An allowance is included in the remodel estimate for seismic upgrades to the existing
building as described in the structural evaluation.
10. The existing exterior walls do not appear to be insulated. It has been assumed that
the exterior CMU walls will be furred, insulated and sheetrocked.
Page 1 of 2
R0EN
, •• aC IiTE B
11. It has been assumed that re-roofing can be done over the existing roofing, thereby
avoiding the removal of existing roofing materials, which may contain asbestos.
12. New bookshelves are not included in the estimate, since they are in the FF&E
budget.
13. For both remodel and addition areas, it has been assumed (as instructed) that 40%
of the ceiling will be suspended acoustical tile and 60% linear wood.
14. Motorized window blinds have been included at the west and south windows.
15. It has been assumed that standard foundations will be sufficient at the building
additions. No amounts have been included in the estimates for underpinning or shoring.
16. In the sitework estimate, an allowance has been included for twenty-one additional
parking spaces.
Page 2 of 2
Moses Lake Library
TOTAL PROJECT COST [ORAFl1
Owner:
Project Name:
Project Number:
Location:
Analysis Date:
Analysis By:
Firm Name:
Contact Info:
Moses Lake Library Foundation
Moses Lake library
MHP #0911
Moses Lake,WA
09/28/11
Ruth Baleiko
The Miller/Hull Partnership
206-682-6837
GENERAL PROJECT INFORMATION
Gross Square Feet (gsf) 30,000 (new + remodel)
Summary
CONSTRUCTION CONTRACTS
FF&E CONTRACTS
Site Development (Roen)
Building Construction (Roen)
Owner Construction Contingencies
Sales Tax
CONSULTANT & DIRECT OWNER SERVICES
AlE Basic Design Services
NE Extra Services Consultants & Tasks
Direct Owner Services
Design Services Contingency
Escalation Factor
Escalated MACC
Escalated $1 gsf
5269,505
57,450,849
51 ,158,053
5701 ,394
$704,334
5172,120
$52,000
$92,845
GRAND TOTAL PROJECT COSTS
Project Schedule Start Date
Visioning Study 08/01 /10
Design (SD thru CD's + Permit) 10101 /11
Bid I AWard 02101113
Construction -Building Addition + Site 05/01 /13
Owner Move-In 05/01 /14
Construction Duration (months)
MACC Escalation Factors Factors I Yr
Based on project schedule timeline above For 2010 0.0%
For 2011 2.5%
For 2012 3.5%
For 2013 3.5%
Base Month 11/12/10
Thru 2010 0.0%
Thru 2011 2.5%
Thru 2012 3.5%
Thru 2013 3.5%
Mid -Pt Const. 11 /112013 0.0%
September 2011
1.098
$7,720,354
$257
$9,579,802
$1,119,058
$1,021 ,299
$11,720,158
End Date
01 /01111
02/01/13
05/01/13
05/01/14
08/01/14
12
Escalation
1.000
1.000
1.025
1.061
1.098
1.098
Page 1
Moses Lake Library September 2011
CONSTRUCTtON CONTRACTS
_~!!~_Q~.x~~gJ?!!I_«:!l_~ ______________________________________________________________________________________________________________________ _
Sitework (Roen estimate 08/26/2010) $245,450
Subtotal $245,450
Escalation Factor 1.098
Subtotal -Site Development $269,505
_~_l!!~~!~..9_9_~!!~~!~_~!!~.!! ________________________________________________________________ . __ . ________ .______ _=-===
___ t:l..~Y'!_~~!~~~sj~_~L~S_~9_~~_P_~,_~t_s~~9_~!~?!~Q_1.QL ______________________________________________________________________ !1,~Z§,~!j_
REMODEL existing (using Roen per SF cost 08/26/2010) $1 ,91 0,428
Subtotal $6,785,802
Escalation Factor 1.098
Subtotal -Building Construction $7,450,849
Maximum Allowable Construction Cost (MACC) $7,720,354
_.9wner Construc_!~~':I_~ontingencie~ _______________________ .
Management Reserve (@X%MACe)5_0%$386,018 'Change 6rderAliow-i@x% MACC) -----------------io.-O% ---------------------$772,035-
Subtotal -Owner Construction Contingencies $1,158,053
----7-.9% ----------------------------$-701,394
Subtotal-Sales Tax $701,394
TOTAL -CONSTRUCTION CONTRACTS $9,579,802
FF&E CONTRACTS
:~-~~_~~~~~~~:~j:::~i~~~~-J-~-Ot~~~q-c-_--_-_--~::-. ______ . _____________ :::~=~:=::=:~~-__ -__ ===-$540~4~§~
Movable ~~!!!.~.Ut!!!."~~'__ca'!~~_~_"-o"k.::dc;ro"p'-'s:L) ______________ . _______________________________ $10,029 _
_ ~ystems Fu~!!itu_~~ _______________ . __ _ -------"1"6 stations + task-------------------------------
___ Works!ati£!'_~_0!!.~!affL_ _________________________________ seating _____________________ $50~00
!-_~~!_~!Y_§~!:!~L'!9... _____________ . _____________________ . _______________ . ______________________ _
__ ~et§!l~t1.e_'_"l~j"__ ________________________________________ . _______________________________ $!§Q~90
____ E.~_P'!!!."_~ __ . ______________________________________________ . ____________________________________________ .:!.!_~_7.c?.92 _
__ C.~~!£r::r!.._e!e"'_"_~.tsj~!~I~y_~~itsc0'AC __ s_~~_~~_"L~.!c.L _____ . _____________________________________ 0 _________________ ~_!.o,oq2_
. ..--ind .P.~_"_eJ __ ~!il~_'!S_" _______ . _____________________________________________________________________________ $23,000
.:!2.£~~_~!?~L ______________ o ____ • __ o. __ o_oo __ ._o _________ .0 ______________________________________________ • _______________ 0_0 _______ _
____ c.ornJ?-"_~~~/M~~it!'!:s _____________ . ______________ . ________________________ 2~lj!.~~g_2_"_§!,l!L _____________ .~_~6,400
__ ...f.'P.!~~.P.~!nte~ ______ . _______ ._o __ o_. ____ oo __________ ?_,.9.p.!"-~~J~~__".~_"~L~s!~t~~.~_i~~.22~L ____________________ 114,89.2.
___ f:._V e,,",Ji?~ent ~~r_~_'!IE£.'!!pose !3_oo~ _________ . _____________________________________________________________________________ ~_! 5,000_
Subtotal
X% of all FF&E Contract Subtotals 7.9%
TOTAL -FFE CONTRACTS
$1,037,125
$81,933
$1,119,058
Page 2
Moses Lake Library September 2011
CONSULTANT & DIRECT OWNER SERVICES
Al~J3aslEJ:.?'!!_~_~a!!_ Se.!.."l£~~ __________________________________ . _____ . __________ . ___ . ___________ ..
(Assu~~~...e.r.9..:<_._.?.:..89°/~~_~E.~J~~9_~~ff...:.~Y.~_!E~!!!?~~~~~~_rlsl ________ . __ . _____________________________________ . _
_ Sche~~~£Q~l9_n 13% _". __ . __ ~91 ,5~~"
_~!,!sign D~y.~J..<P.~~~.!.. ____ .. __ ._. ___________ "." ___ . __ . ________ ._ 20% ___ . ____________ • _________ J!_1_40~86~_
Construction Documents 36% $253,560
-·Bidding-·--·-·-·-··-··-----·------·····--·--·····---·---~-·-·-··--·--····-······-·$14:O87-
-COnstruction Adniinisti--atTon-----· 27% ------------$19oJ70 cios.:oii-t ----.. ..----2% "$i4,087-
Subtotal -AlE Basic Design Services $704,334
AlE Extra Services Consultants & Tasks --Acousticai"Corisultant-------------·------------------·-----------------------------------------$"8,000
~UdiOViSUa-I-T~~E.q~i~~~.! D~~9!!]lnfra~~~~ti:i~e O~Y.L __ _=====~~~==:~==~==:===:=:~=~==-$-8,OOO_ Building Envelope Consultant $8,000
-CTviiOeSlgn ------$20,000
~-Coordina!~ Shel~J:6g and Fui-n~-"--------__===____====::=~-_==~=_-------------$12,O00
Data I Telecom Des.ill.!'. (Infrastructu~~.9.!'!l'_) __ . _____ . __ ... ___ ... ___ ._. __ . ___ ._._. ___ $10,000
Document Milestone Reproduction $5,000
'E-nhancecj*"ConstruCt[,);) Administration (IncreasedArCh-FTE wI enhanced CA)------------·--------------$50:000-
=:)fardw~-COriSLiitanC---·-------------------------.------.-----.----.--------.~~~=~=~==-$5.riOO
Landscape Architect ______ . ______ . ________ ~_. _____________ . _____ . _____ .. _________ $10,000_
Lighting Des!ll!:C."-~'!..~'!.ltant .. _ .. _._. __ • __ . __ . __ • ______ .... _. __ ... __ ........... ___ ........ __ • ___ ._ .. _ .... _ ... ~.!Q.9.9.Q.
_--'3~rd DE.'?~_t!lent Produc~~.@~£'l]]pleti<?.i!. of C~ __ . ______ . __________ ..!?,OOQ.
Reimbursable Expenses (@ 3% of total AlE design fees) $21,120
Subtotal" AlE Extra Services Consultants & Tasks $172,120
Direct OWner Services
_~,!!Iding Envelopi:fi6.~uitant (dur!!'9...9Ephase) . --.. ---.. --· .. ·-=:==:::::-=:::::==:==::::-.. -·~5,000
._.~J!din.9J:..erm!!..~ez_~..t~~.owance, _~~~s to ~~9_1!!~~~~~~!'2..gl!tl. ______ . _______ " ________________ . $20,000
.~.£.r:nmissionin~d Training _________ __________________________ .$10,000_
. __ ".§_eotechnicallnvestigation (Design Report & Const Testing) _______________ ~2,000
Testing Required During Construction $5,000
Subtotal -Direct Owner Services $52,000
Design Services Contingency
X% of all Consultant & Direct Owner Services 10.0% $92,845
Subtotal -Design Services Contingency $92,845
TOTAL· CONSULTANT & DIRECT OWNER SERVICES $1 ,021,299
GRAND TOTAL PROJECT COSTS $11,720,158
Page 3
FOUNDATION
Dear Friend,
The mission of the Moses Lake public Library foundation is to promote the use , development,
and improvement of the Moses Lake Public Library's services, collections, and facilities. The
foundation does so by providing advocacy, financial support, and leadership for library related
issues and we need your help. Please read this brief message and consider the ways you and/
or your organization can work support this project.
Bu ilt in 1964, the library has served the community well for many years, but it doesn't meet ADA
requirements or the needs of modern technologies. The population living in and around Moses
Lake, and the use of the library, has also grown significantly since 1964, but the library has not.
Materials circulation alone has increased 87.7% during the past ten years . The result has been
restroom and other areas of the facility that cannot be used by persons in wheelchairs or
walkers , library programs must take place in the main part of the library which interrupts others'
use, and collections have either not grown or have been eliminated due to the lack of space. It
is time to do something about our public library.
Since its inception in 2006, the foundation's primary focus has been to find a way address the
inadequacies of the current library. The foundation contacted a number of architectural firms
with significant experience in library design to develop a concept for a new location and facility.
However, after hearing from the architects and receiving input from the community regarding the
ideal location and unique design of the current facility the foundation chose to focus on the
possibility of remodeling and expanding the current building instead .
The facility was evaluated by an engineering team which determined that while the building is
structurally sound, the electrical, plumbing , and ventilation systems are long overdue for
replacement. With this knowledge in hand the architects completed the concept design and cost
estimate. The design calls for a major remodel of the existing building and the addition of
approximately 20,000 square feet to be located on underutilized space between the library and
the Chamber of Commerce.
The foundation is very pleased with the design. It addresses the need to meet ADA
requirements so that, for example, users in wheelcha irs and with walkers can use the restrooms,
new flexible space would be made available for library programs and events, study groups,
Friends of the Library book sales, book clubs, etc., which would not interfere with others' use of
the library, additional space would also allow for the expansion of the book and other collections,
and the remodel and addition would bring the library's ability to meet the needs of the modern
users. This new modern, flexible design will meet the needs of our community for many years.
Throughout this process the foundation has worked to keep this project in the public eye through
the development of a web site (www.mlplf.org) and facebook page, the recent Book a Night with
the Library dance and wine tasting event, and hosting a booth at the Moses Lake Farmer's
Market, as well as numerous articles which have appeared in the Columbia Basin Herald.
The next step is to have the Moses Lake City Council endorse the project. The North Central
Regional Library District is only contracted to provide staff and the collection. The City of Moses
Lake actually owns the building . This will be a costly endeavor and the foundation is willing to
help raise funds and apply for grants but without buy-in, commitment, and at least partial funding
from the city this project will not happen.
What You and/or Your Organization Can Do to Help
The primary purpose of this message is to inform you that the foundation will be making a
presentation to the City Council at its November 2ih meeting to ask for their endorsement of this
project. First and foremost we would like to ask you to contact the city to express your support.
You can send an email message from the city's website: www.cityofml.com
Letters can be mailed to:
401 S. Balsam St.
PO. Box 1579
Moses Lake , WA 98837
Phone (509) 764-3701 FAX (509) 764-3739
We would also welcome your attendance the night of the City Council (Nov. 27). They are held
at 7pm in the Civic Center Council Chambers (401 S. Balsam St.).
If you would like to find out more about the foundation and how you can help support our public
library, financially or otherwise, please check out our web page (www.mlplf.org) or you can "like"
us on facebook.
Thank you for your support,
Tim Fuhrman
President
Moses Lake Public Library Foundation
Dr. Terry Leas
President
Bend COMMUNITY COL1..£GE
November 5, 2012
City Council
P.O. Box 1579
Moses Lake, WA 98837
7662 Chanute Street N.E.
Moses Lake, WA 98837
509.793.2222
TDD 509.762.6335
FAX 509.762.6329
Office: 509.793.2001
terryl@bigbend.edu
I am writing in support of the Moses Lake Public Library. Built in 1964, the library has served our
cvmmilnity well for llcarly 50 years, but ii no longer meets patron3' AD/!~ requirements or the demands
for modem technologies. The number of people living in and around Moses Lake and their use of the
library have grown significantly since 1964, but the library has not. Materials circulation alone has
increased 87.7% during the past ten years. This growth has resulted in restrooms and other areas of the
facility that cannot be used by persons in wheelchairs or walkers; library programs that must take place in
the main part of the library, which interrupts others' use, and collections that have either not grown or
have been eliminated due to the lack of space. The time to do something about our public library is now.
An engineering team evaluated the library and determined that while the building is structurally sound,
the electrical, plumbing, and ventilation systems are long overdue for replacement. With this knowledge,
the architects completed a concept design and cost estimate. The design calls for a major remodel of the
existing building and the addition of approximately 20,000 square feet to be located on under-used space
between the library and the Chamber of Co=erce.
The design also addresses the need to meet ADA requirements so that users in wheelchairs and with
walkers can use the restrooms; new flexible space would be available for library programs and events,
study groups, Friends of the Library book sales, book clubs, etc., which would not interfere with others'
use of the library; additional space would also allow for the expansion ofthe book and other collections;
and the remodel and addition flexible design would enhance the library's ability to meet the needs of
modem users for many years.
The next step is for the Moses Lake City Council to endorse the project. The North Central Regional
Library District is only contracted to provide staff and the collection; the City of Moses Lake actually
owns the building. Whil e this project will be a costly endeavor, the Moses Lake Public Library
Foundation is willing to help raise funds and apply for grants.
The Moses Lake Public Library Foundation will make a presentation to the City Council at the November
27th meeting to ask for your endorsement of this project. I respectfully request your support of this worthy
community project.
Sincerely,
Terrence Leas, Ph.D.
President