Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2151
<J W Recitals: RESOLUTION NO.2151 A RESOLUTION AMENDING THE SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR 1999-2004 Pursuant to the requirements of RCW 37.77.010, laws of the State of Washington,the City of Moses has prepared a revised and amended Six Year Transportation Improvement Program for the ensuing six calendar years, 1999-2004. A list of streets are proposed to be adopted to amend the Six-Year Transportation Improvement Program. Pursuant further to said law, the City Council of the City of Moses Lake, being the legislative body of said city, did hold a public hearing on said comprehensive plan at 7:00 p.m. in the Council Chambers at the Police/Court Facility in Moses Lake on December 8,1998. Resolved: The City Council of the City of Moses Lake adopts the revised and amended Six Year Transportation Improvement Program for the ensuing six calendar years, 1999-2004. A copy of said revised and amended Six Year Transportation Improvement Program for the ensuring six calendar years,1999-2004,together with a copy of this resolution shall be filed with the Director of Highways of the State of Washington. ADOPTED by the City Council on December 8, 1998. Mayor ATTEST: •inance Director *p »s~.<Washington State DepaK„.<ent off Transportation Agency Moses Lake County No.13^ City No.0805 MPO NON Ci Six Year Transportation Improvement Program From 1999 to 2004 Hearing Date Adoption Date Resolution No. 12/8/98 12/8/98 <0 .2 (A "5 iS §° u_ Project Identification A Federal Aid No. B.Bridge No. C.ProjectTitle D.Street/CountyRoad Name or Number E.Terminal Beginning and End F.DescribeWork to be Done c «of *! E CO s s CO f ftC 0) I ! s 3 ProjectCosts in Thousands of Dollars Federally Funded Project Phase Phase Start (mm/tidfyyyy) Fund Source Information Expenditure Schedule (LocalAgency) Projects Only Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 2 Phasesin Project Overlay and/or Seal Coat Projects (1 each year) Overlayvarious streets in the City 07 P 0 PE CN 1/1/99 5/1/2001 1500 1500 200 300 200 BOO No Totals 1500 1500 200 300 200 800 14 2 2 Phases in Project Signal Coordination Project 12 P 4 miles PE CN 1/1/99 6/1/99 300 300 300 No Totals 300 300 300 19 3 2 Phasesin Project 7th Ave, Division to Alder 7th Avenue pave7th Ave.and addcurb and sidewalk 01 P 0.4 C S G P T W PE CN 1/1/99 I 5/1/99 J 75 751 75 1 No Totals 75 75 75 14 4 2 Phases in Project Traffic Signal at Pioneer &Sharon 12 P 00 S G P C T W PE CN 1/1/2000 5/1/2000 250 2501 I 250 No Totals 250 250 250 ORDINANCE 2151 /PAGE 1 of 2 3fS Washington State Departm©^1Transportation Agency Moses Lake County No.13 City No. MPO 0805 NON Page £Six Year Transportation ^orovement Program From 1999 to 2004 Healing Date Adoption Date Resolution No. 12/8/98 12/8/98 (0 Is §° u_0-2 Project Identification A Federal Aid No. B.Bridge No. C.ProjectTitle D.Street/County Road Name or Number E. Terminal Beginning and End F.Describe Work to be Done c E a s CO c 1 (A 0 3 Project Costs in Thousands of Dollars Federally Funded Project Phase Phase Start (mm/tidfyyyy) Fund Source Information Expenditure scneauie {Local Agency) Projects Only Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M/W/YY) Federal Fund Code Federal Costby Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 5 2 Phases in Project Diivision Street-Hwy 17 Interconnect Yonezawa Build Yonezawa toconnectDivision Stto Hwy 17 01 P 2.5 C S G P T W PE CN 1/1/2001 5/1/2001 2000 2000 2000 No Totals 2000 2000 2000 01 6 2 Phases in Project Block(650')&Penn (1,400')5th to Wheeler &Elderto 01 P 0.4 C s G P T W PE CN 1/1/2002 4/1/2002 300 3001 300 No Totals 300 300 300 Grand Totals for Moses Lake 4425 4425 575 550 200 3100 ORDINANCE 2151 /Page 2 of 2