Loading...
510 PLAN. DOC.CEO-la •LOCAL AFFAIRS DIVISION.PLANNING SECTION 10/^3 DEPARTMENT GF COMMERCE AND ECONOMIC DEVELOPMENT STATE CF WASHINGTON URBAN PUNNING ASSISTANCE PROJECT DATA FOR METROPOLITAN AND REGIONAL AREAS .(See Instruction Sheet CED-la for preparing this form) AGENCY TITLE OR NAME • City of Moses Lake.Washington 'Z ADDRESS OF APPLICANT City Hall,Moses Lake.Washington AREA POKIUTION .t,5,600 • "bate of Conference Held Prior to PLANNING AREA IN SQUARE MUES 40 Submittal of Application ATTACH BRIEF DESCRIPTION CF AREA,INCLUDING ^ NAMES OF COUNTIES AND PRINCIPAL CITIES AND •-Date received in the Department of A SKETCH OR OUTLINE MAP IDENTIFYING THESE Commerce and Economic Development •HUNCIPAL POLITICAL SUBDIVISIONS. I.DESCRIPTION OF PLANNING HOGRAM SEE ATTACHED DESCRIPTION V MOSES LAKE,WASHINGTON I.DESCRIPTION OF PLANNING PROGRAM A.OUTLINE OF PLANNING PROGRAM The proposed study extends a comprehensive geographic coverage as well as thoroughly covering relevant functional subject matter. The surveys and plans would cover an area which is buildable and can be considered likely to develop within the next twenty years. This is the Moses Lake Planning Area for which the Comprehensive Plan will be prepared. Periodical meetings will be held with the Planning Commission, City Council,Downtown business groups,Civic clubs,interested citizen groups and others,to explain the purpose of the planning program,brief them on the progress of the work and point out the major findings,probable implications and seek their suggestions and participation. The program is to be divided into three phases corresponding to three budgetary years,with the Comprehensive Plan being completed by the end of the second phase.The third phase would correspond to measures of plan implementation. B.PROJECT DESCRIPTION 1.Local Goals for Development The standards will be drafted by the Consultants and submitted to the Planning Commission and officials for review,probable modification and subsequent adoption.Based upon the approved standards,surveys and studies,probable future land use esti mates,community facilities and thoroughfare requirements will be dimensioned and allocated to areas on the basis of demand and the policies incorporated in the adopted standards. 2.Maps and Related Materials a.A planimetric base map and a topographic overlay will be prepared from existing sources for the City and adjoining areas likely to be subject to urbanization and annexation to the city within the next 20 to 25 years.This map will be at a scale of not less than 600*: 1"and shall show street and highway rights-of-way,railroads,water courses and other planimetric features,and civil divi sions.It shall be adequate to the presentation needs and will be drawn on reproducible material. -1- b.A Central Business District Map will be drawn on repro ducible material and its scale will be 100•:1". c.Other special purpose maps and graphics at suitable scales will be drawn for public presentation,illus trative design purposes and photographic reproduction. 3.Surveys,Analyses and Studies >»a. Economic Base Study L7 (1)The economic work prepared in the 1965 report will be utilized,updated and expanded where appropriate, (2)The economic study will determine the Community^ relative economic competitive position in a larger parent area.In addition to the general evaluation of dollar value and transaction trends (value added by manufacture,wholesale,retail and service re ceipts,dollar volume trends and estimates),the study proposes to evaluate income trends,income sources and levels. .(3)The employment study proposes to assess the compo sition of the labor force,occupational structure, productivity trends and evaluate the probable size and composition of the local employment structure. (4)Income and adjusted net retail buying power anal yses will be made as a part of the over-all eco nomic base study.Total existing and potential available net retail buying income per unit and totals, will be determined. Retail sales trends correlated with the corresponding dollar amounts for each retail merchandising category will be in vestigated.Discrepancies between actual sales and attainable sales will be noted for the Moses Lake Trade Area. b.Population Study (1)The population work presented in the 1965 report will be utilized,updated,refined and adapted for the needs of the Comprehensive Plan. (2)The population study will investigate the Commun ity^population trends and determine how success fully it has shared in population growth in rela tion to the County and larger parent areas. -2- (3)It is proposed to arrive at a terminal population capacity for the Planning Area through the analy sis of vacant land capability,the approved devel opment standards and those tools which prescribe the density and manner of development. (4)The proposed demographic study intends to evaluate the trends in the composition of the Community's population by age,sex,race and nativity,and other pertinent characteristics.This study will {also provide the basis for determining existing ^and future levels of trade and employment,and for determining existing and 1980 levels of ad justed net retail buying incomes and the corres ponding floor and land area requirements. c.Land Capability,Geology and Holding Capacity Studies (1)An inventory will be made of all existing published materials on the City's and the Planning Area's geology,topography and soils and water.They will be used to define and locate existing and potential agricultural areas,surface water resources,major soil types,major geologic and topographic features, (2)The Area's terrain will be analyzed and classified according to its suitability to sustain a given use.In conjunction with the Area's net holding capacity studies,this study will help to deter mine the size and configuration of suitable serv ice for schools,parks,fire stations and other community facilities.Other information relevant to the utilization of land in the Planning Area will be gathered and tabulated.This information ._}will include,but not be limited to lands that are subject to flooding,the major public and private ownerships in the Planning Area and those lands deemed unsuitable for intensive urban development. (3)The Planning Area and subsequently delimited sub- areas,will be studied in terms of their net hold ing capacities at the terminal points of develop ment.Any area's net holding capacity will largely determine future community facilities and utilities requirements,especially school,park site,right- of-way acquisition and development. -3- cHiCDr-\/—»DCnaoH-»a*oOOrttoCDp o>p p to»nH*OPLNPCD4CDPIT<S>fN)h-»OpCDH*PJH-Hipp*CtoH*K*2a*OP4CD<PPPn»/>«/cOP(Atoprtn,grtpurtoP3H«PputoH*p p**wrt rtP*p.HrtW.CD PopuCD»-•p.[J'pHMOOPuPCPPP3rt< >«rtrt£tHrt£w>H«4CDpP*P*OCDO*Hi«4PH«PH.H-rtCXX•rttoPCD CDH-CD CDP*CDP*p:„POPPuCDpCDCDO^!-•i-»toOrtrtOQc+TtH'pto»T3H'ccH«toto4wtoenl-»S3CDI-1CDH«HPOQP»-•.to43H«O3^aO^<•W(flOrtH-HWto•OP*CD7?3ftCD\-*-1"W<oH«toCDOrt3POCDPWO CD CDps:*pH«to prt4WO5H»CDoPOrtCDtoH-PH«toCrtrtCDPgl-hNPCDP*4 POCDtoH«rt.• 4tor+OQ CD4PWH«5WV-,CP3<wPrt4Pu3toH*P£•-OfCD^Jp*ps:ppCO—r+•rtP 4CDp,gCDPrtCDPurt rtOrtPOCDPCP3H-Ph-"OH«H»H«0QrttolPP*ftPOtoOQCDc:s:pp:H-CD>-•=s4l_iH-pP4 4H-»cn°>-^toP prtTiOH*PC*S>3PCDH-P*CDPCuPuH'CQn4OPjH»PP PrtCD CDrtacrePurtCDl-hl-^OQH*PuHiPuCDoH«4_OH«Ov;l->H*oCDPPu3H-»!-•4H*ptoPTicCDtoH*PrtpSOrtOrtCf^Sp.pp.p4CD4 Puv;H'H-PCDpupffi<CD£HhPt-b(-•p pCDCDH-1CDt-*wPpP 4Pura*rt<:toOQ»-•PCD• oCDpH«tortrts:CDPupus:CQtoDOrtMiXH**<*<pPCD CDH-CD3c>-•HtoH«O*CDH*CDH-4O4cpH»toPPPurtH«t-"WprtCD CD5C2L4pto(AP"p prtH-"CDHrt<MCDH-CDtoH«OH«rtpPh->&t->Z?H«pC*xiomcrPp35-nsSP1HI-"H*H»CDl-«CDPH*»-•otortPuOOZZp.oH*P •tooC4H*I-*puCDSfftPuOp:OPO>-••ulP4_P4*->HiPpTiPu4 PCDMCDOPrtH«woH-»CD OQop.p**OoPuOOQPoa*Ort»-*CDtos:CDCD pCDN1PH-OQH-P§H«O CD3rtCD3TtCDHiP*OtoptoH-PtortCD OQsurvTheheddusughfmandtotsob•P»rtP 4rtV)to toPP*•d3CtoTioo3CDrtto»-*n3i—13jp:toP*OPuH-1OQ PH«toPurtrtI—1oH£4o»-•XH*CD CD4rt(0P)Ho3H«H«§to<o9CDCDcc3OCDPCDHCDrt3£CD<CDatootoCDHitoCDcCDV)(0toeucuOp PWH«.H-rtCDcnrtT3rtPPuH*CDPuCD4*<_oPCDP*pCD CD*dCDf+h*s:(/>C^xov;a.CDrtcrCD4rtf-»P4w<CDtopto&CDO44rt4Xh-»CDH«O3*UPH»PXCDPuH-SPuOH*S'SrtoPutortprtCDrtcOXCDPu pOH-3*-•HiCD*nssr.(AO*rtrt$OCD 4l-»4H*H«Or*CD>-»CP*toP«»T3top.H'Ti5PCD>-»Ph-«p.p.H«CDH*CurtH-4oWCDPtPuH-CtoHpH*Pu^1pCDP P 3 toK*OH»CDP_rtrt*<H-«H-»PuOpCDPP*PrtOPuStoO3rtHj??*pv;Crttotop prttot-*Wrt«-i.PHPCDH*V.rtcry1—»1—»CD4 P P<t-1CDOp:4PrtCD4O*CD»-•O*•PgCDCDOl-h4CDpuCDv;1±24£SPuP P.h«CD•-•OPHhp.OPuH-CDD-p£H>PPuO*P•aol—•toHP*PCD4 Prta*T33i-1*rtcPuHip 4O*o"•O*H*toCDOCD CDrtI-*HiMiOH«CDCDPutoCDPutoCDl-»OCftH*4 3rtH«rtp.PCCCDHJCD§H-*CXrt rttoH»pC^WH-«H«PuCDP^Hrtp*P*H«CDpCD CDHiC4CDpui-«rtrtto pPupH«H-toPoCDl-JOQH*P*OOPOotort3PT3rtCO.H-%toNOprt4H«H.4Ph-»_tatoCD44—PCDrtp:cd«rt!_ih«rtrtCDP!CDOPp owCD CDrtTJPh-*OppupXCT"CDr+toH-T3•o.gHPH*H»pOC(AH-^PurtPWH«PuCDH-4 PuH»p 4 4CDtoH-Hia*pCDrtH-»<S3PuOH«•)-»4H-PHlttlj*•£toPOrtv-c4rtPcOCD4o4oH-«CDpH«•dCDH-»^<CDp OQOQH-»4cCTClH-tltoH*p CDOQrtH>rt*<d"rtrtH*OCDOh-»H«^P Pph-iopOrtPtoCDPi-bCDCDpuPuaH*c4Hcr^PHh(ArtPo-SPpPuH«&pHiCDO*CDtortOPuPuW4rtP oOHP CDCDCOQCDOOQrtH>PuOrt4h*"rt4W4HirtCDP*HirtCDH»PP(APrtCD CDH«H'H«CDC toH-»T33CDOCDCOCDOOCDOQp*Wi-hPuna1—'>rtrtH«OOrtOPto toCDrtPto p 3 4rt4CtoHOPCDrtCD •H*to4H»44H«<CD 4OP to pto 5CD CDpuH«tol-hrtp pp*<rtto7?CDP*PP*Ho_CDrtCDCPH-toCD33ftrtCDrtOCCDu.vOCDCD CD CDOCDH-S^v-POH-»rtrt.!-•3P*CDOtoHirtOQ O 4**<H«Pu<PCupJ4WCTJ'TdH-P•rt^<fiLP*CDH«l-hCD3p.l-ioPup:O4H»o pPPtotoPwo*»ct4£2CH*O*rtH*dH)OPCD5!-•OCDH«4 4rtCPr+H*a*VH*l_ip.CD1rtp-CDp43Pu1H«toCDOH-H><rtCDH-OWOQPSOCPPtolPupuCDiCD<OH)toPuOCDWCD^P"PuOIOQ1to1CDrt11topto1CDto ^ (a)A preliminary listing and ranking,according to importance,of housing problems within the Plan ning Area. (b)A preliminary listing and ranking,according to importance,of obstructions to solving identi fied housing problems. (c)A summary of major planning and implementation actions taken in the past three years and under way to solve housing problems. (d)A preliminary statement of annual housing plan ning and implementation objectives covering three to four years. (e)An annual planning agency work program covering three or four years. g.Functional Area Studies Residential,commercial,industrial,public and recrea tional area studies will be carried out as a part of the •formulation of the Moses Lake Comprehensive Plan in terms of the following criteria: CI)Trends and density of development (2)Locational factors (3)Land absorption rates (4)Vacant land analysis and amounts (5)Zoned versus used land (6)The functional area's relationships to utilities, thoroughfares and adjacent uses (7)Prospects for expansion or contraction of any of the functional areas (8)Prospective areas for annexation h.Community Facilities and Utilities Studies (1)This study will consist of a complete investigation of the existing public facilities and utilities,and -5- an evaluation of recent public policy decisions. Stock-taking of the facilities and utilities and their comparison to the adopted standards and estimated future requirements will provide the necessary foundation for the evaluation of the existing and future needs in terms of the public facilities and utilities. j (2)The analyses will depict public schools,parks, playgrounds,fire stations,libraries,public ^buildings,the airport,major utilities and other relevant improvements in terms of their present adequacy,distribution,relationships and requirements for 1990.The public facility and utility element will be the determining factor for the major expenditures for Capital Improvements Program. i.Thoroughfare Study CI)Land use and thoroughfare planning studies are not new to Moses Lake.During the last decade an entirely new approach to the thoroughfare planning has developed,recognizing that the older,piecemeal planning efforts provide no lasting solutions to the transportation prob lems.A new approach based upon comprehensive planning principles is necessary if all ele ments of the transportation problem are to be considered.Such an approach recognizes the following two principles: U (a)An individual road,highway or arterial street should not be planned in isolation. It must be recognized that the total ur ban thoroughfare network acts as a system in which every element affects the use and effectiveness of other elements of the system.Each individual facility should, therefore,be planned and designed as a part of the total system.The effect of each thoroughfare link on the remainder of the system should be tested in its abil ity to carry projected traffic loads. Cb)Thoroughfare planning should not be separ ated from land use planning for two reasons -6- u w [X]The land use pattern determines the amount and spatial distribution of travel within an urban area. [2]The thoroughfare system that is plan ned and built will be one of the most important determinants of the future land use pattern for it forms the framework of all urban development. C2)A system consisting of State highways,major County roads,and City arterial streets will be selected and evaluated in terms of its adequacy to serve present and future urban development. 4. Specific Area Studies It is imperative that the Central Business District receive special emphasis and greater detailing than the over-all Com prehensive Plan for the Moses Lake Planning Area.The Central Business District is an area where the land costs are high, the space is tight and the concentration of population and interest most intensive.In order to be able to evaluate the present role,its potential and its ability to compete suc cessfully with the more recent developments,the following investigations are basic to the formulation of a plan for growth or contraction. a.Questionnaire Survey Cl)A detailed questionnaire will be prepared and distri buted to the retailers in the Moses Lake Downtown. The questionnaire will measure the attained produc tivity in terms of dollars in sales per gross square foot of floor area and compare these productivities to those obtained in other Pacific Northwest com munities.This questionnaire will also inquire into the attitudes,problems and aspirations of the Downtown retailers. C2)The policy directives,together with the question naire responses and other factual information,will provide the basic guidelines for the preliminary design concepts.The size of the future popula tion,adjusted net retail buying incomes,buying habits,available retail facilities and their di versity,will assist to dimension the probable future size of the Central Business District and the feasible size of the satellite commercial areas. -7- b.Central Business District (CBD)Study The CBD will be assessed in terms of the following assets and liabilities: Cl)The degree of diversification as represented by the available floor area in each major retail category and the actual sales volume. C2)Availability of public utilities or facilities. (3)Spatial distribution of retail and service estab lishments and their relationship to the vehicular, pedestrian traffic and parking facilities. (4)Determination of the relative value of the core blocks in terms of tax valuation in: Ca)Land and improvements Cb)Front Clineal)foot valuation for core blocks Cc)Intensity of land utilization by block C5)Vacancy rate by block and major land ownership patterns. (6)Assessment of the CBD as the hub of the Moses Lake Planning Area with respect to revitalization, renewal and new construction in undeveloped areas. c.Parking Study A parking study in the Central Business core area of Moses Lake provides the basic information for preparation of a parking plan.It attempts to answer the basic question, "Does the existing parking supply in the Central Business District satisfy the existing and future parking needs?" To provide the answers,the following field surveys will be carried out: Cl)The number and location of all on- and off-street parking spaces will be inventoried. C2)Past parking revenues will be studied and summar ized. (3)The available parking space supply will be related to and compared with the floor space it serves. -8- Comparative parking analysis will describe under or over supply of the existing facilities and com pare the results with other communities. 5.Reports and Meetings There will be no formal report as a result of this Project. -The Consultant will meet periodically with the Planning Commission and others to present findings and report on progress. II.RELATIONSHIP TO PLANNING PROGRAM A.Detailed economic and population study was prepared prior to this application. B.Subsequent to this phase,the City will apply for additional funds to carry out the second phase which will be primarily the plan prep aration stage.The third phase will be comprised of planning im plementation measures and capital improvements program. III.COORDINATION A.The proposed program will be under the sole jurisdiction of the City. B.The County Planning Agency is engaged in a planning program;how ever,it is felt that their work in no way infringes or duplicates what this application proposes.There have been frequent meetings and the exchange of ideas with other agencies involved in planning activities. i *C.The City Council is aware of their planning needs and has embarked >*=s*on a plan preparation program.The Council and the Planning Com mission after having had an opportunity to define their long-term development goals,which will be expressed in the Comprehensive Plan,intend to follow and implement this long-range development policy. -9- PCA-2 COMMUNITY AFFAIRS DIVISION, LOCAL PLANNING SECTION PLANNING AND COMMUNITY AFFAIRS AGENCY STATE CF WASHINGTON REQUEST FOR URBAN PIANNIMG ASSISTANCE PROJECT BUDGET (See reverse side fpr instructions before preparing x-his form) Local Governmental Unit • .**•*CITY OF MOSES LAKE . .:1.-''PROJECT BY STAGES •..•'Number of Months •'a.'Completion of project or phases of project '••'"''included in this application... b.Completion of 50/*of project or phases of the •project "included in this•application.__J 5 2.COST CLASSIFICATION ~~:'BUDGET REQUESTED '.'•.•.'*"'. .'•••"''Subtotal ' Total- --..••1 -- . , r j 1-. -1 - . r--•-1-i.rj.r j-i.1 1 1•ill 1-11 ,,._-'-~~--—I I I .--.. -~1 •'• •av'.Services by Private-Technical.Consultants •.*• (1)Personal Services (Salaries &Wages)'•'•'*$,. V.(2)Travel..;V....*.•......*.-.,..''" '* (3)Reprpduction and Publication..•(k)Other Services...•...-...•."~$28*000 ••b'.Service by City or County Applicant • *••'.(1)'Personal Services (Salaries &wages)• '••'.."*'(2).Travel..*....;TW.'._ (3)Reproduction and Publication _(h)Other Services . $3,300 c.'Services by other Public Agencies ' . •(!')Personal Services (Salaries &Wages)«... •(2)Travel..._ (3)Reproduction and Publication ♦• (I4).Other Services . • •$ d.Project Inspection Fee ;$320 e.Total Urban Planning Assistance Project Budget $31,620 3l SUrS-IAkY (Comouted to the nearest $10) a.Federal Grant Requested ,$ 21,080 b. Contribution by Local Governmental Unit $10,540"• (1)In Cash $7,340 (2)In Services $3,200 c.Total Value of Project ".$31,620 approval of the total project period shown in No.1.and of the Urban Planning Assistance Project Budget in the-amounts'shown in -No.2'is hereby requested. Bate '.•.1969 '•••••'"; • . ' 'Signature of-Authorised Officer *'*.••Title fiTY "MANAGER PCA-3 SUGGESTED FORM OF RESOLUTION (12-67)*RELATIVE TO URBAN PLANNING ASSISTANCE GRANT WHEREAS,THE CITY OF MOSES LAKE ,desires to provide for a planning study contributing to an over-all program for future community development,the preservation of community values,the prevention of conditions tending to cause urban blight,and.the promotion of the general health,safety and welfare of its citizens;and WHEREAS,the Planning"and Community Affairs Agency of the State of Washington,under authority of Chapter 7*S Statutes 19^71 Extraordinary Session, may provide planning assistance for such program and receive financial assistance from the Urban Renewal Administration, as authorized by Section 701 of the Hous ing Act of 195^1 as amended, NOW,tflEREFORE,BE IT RESOLVED,that THE CITY OF MOSES LAKE hereby requests the.Planning and Community Affairs Agency of the State of Washington to provide planning assistance under authority of Chapter 7^»Statutes I967j Extraordinary Session,with such financial*assistance as may be provided by the Urban Renewal Administration^under authority of Section 701 of the Housing Act of 195^(P.L.860,83rd Congress),as amended.That such planning assistance is more particularly described in a project description that is attached hereto and made a part of this resolution as if fully set forth herein. THAT,THE CITY COUNCIL OF THE CITY OF MOSES LAKE ;, subject to,approval of such planning assistance by the State and Federal authorities, hereby authorizes: (a)payment to the Planning and Community Affairs Agency of the State 'of V/ashington of a sum not to exceed $7,340 in cash,and (b)use of personnel of the CITY for technical assistance in this project,v/hich assistance has an estimated value of S 3,200 . . THAT,the total"*estimated cost of the CITY •»s project-as planned is $31,620 . THAT,the authorized official of THE CITY OF MOSES LAKE be,and he hereby is,authorized and empov/ered to execute in the name of THE CITY ^all necessary contracts and agreements to implement and carry out the purposes specified in this resolution. Passed by the CITY COUNCIL of the CITY OF MOSES LAKE tMs day 6f ,1969 Effective IMMEDIATELY ATTEST: (Clerk)•(Authorized Official) (Original and four certified copies to be submitted with the application to the Planning and Community Affairs Agency of the State of V/ashington.) PCjA-6 COMMUNITY AFFAIRS DIVISION,LOCAL PLANNING SECTION PLANNING AND COMMUNITY AFFAIRS AGENCY"'' STATE OF WASHINGTON TABULAR SUMMARY ....__,,,-._ WORK ELEMENT- WORK TO BE PERFOPxMED BY TIME* COST ESTIMATE 1.Goals and Standards Consultant 3 $1,400 2.Mapping it 4 1,200 3.Economic Base tt 4 1,800 4.Population Study ti 3 1,200 • 5.Land Capability and Holding Capacity tt 4 1-5600 6.Land Use Study it 8 3,400 7.Floor Area Study n 3 1,200 .8.Housing and Condition of Structures it 9 3,800 9.Functional Area Studies ti 4 1,600 10.Community Facilities Study •»8 3,400 11.Thoroughfares Study ii 3 1,200 12.Questionnaires ii 3 1,200 13.CBD Studies ii 7 2,800 14.Parkipg Study ii 6 2,200 Assistance by local personnel on above items - number 1,2,5,6 and 8 through 14 City 23 3,300 "L • OTHER STAFF COSTS (SPECIFY IN SPACE BELOW)$31,300 PROJECT INSPECTION FEE '.$320 SUB-TOTAL**$31,620 STATE AGENCY C0STS$ $__TOTAL. *Estimate completion time in man weeks or man months,check selection— months weeks X ,and use the same unit throughout this summary, **This figure should be the same as Box 2 Line e of Form PCA-O-