Loading...
59RESOLUTION #59 A resolution of the City of Moses Lakesetting the minimum requirements for the gravel surfacing of all streets and/or roads and.or/alleys within the corporate limits of the City of Moses Lake, Washington. _ kJ VJHERFAS,land has been platted within the corporate limitsof the City of Moses Ln.ke without the streets and/or alleys in said plat containg sufficient gravel. NOW,THEREFORE,be it resolved by the Council of the City of Moses Lake ,as follows; No plat will be accepted by the Planning Council and/or the City Council of the City of Moses Lake for tne platting of real estate within the corporate limits of the City of Moses Lake and no real estate will be annexedto the City of Moses ^ake or brought within the corporate limits in the form of platted landunless all streets and/or alleys have a gravel surfacingwhich shall conform to the following minumum requirements; All streefefe and road -ravel surfaces shall conform to the following minumum requirements; one 'he areas shall be surfaced withf(l)inch minus crushed rock,screenedand partially crushed gravel or a combination orboth.Not less than (30) per cent of gravel particles shall have at least one broken face. All surfacing material shailjpass aoone inch square,screen with not less than thirty (30)per cent,nor more than sixtyfive (6?)per cent,passing a lA"square opening. The fraction passing a U.S.#10 sieve shall have the physical properties of group A-l A-2,or A-3 mortar as classified in Public Roads,Volume 12,No.?. Surfacing material shall be reasonably uniform quality throuunhout and shall ^contain no soft or disintegrated stone or other objectionable meterial but shall contain a sufficient percentage of suitable earth or other cemehtitious binder to readily pack. Surfacing material shall be deposited in two (2)lifts upon the prepared subgrade to such depths as will form a cpnpacted, finished roadway of the depth and cross section directed by the City but in no case less than four(^f)inches in depth. Spreading shall be done as soon as each lift is dumped.The Contractor shall be required , as far as practical.,to haul material over the surfacingas it is placed.Placing shall begin nearest the point of lo ading and shall progress from that point.Material shall be continually shaped or processed during the course of construction. PASSED AND ADOPTED by the City Council of the City of Moses Lake,this 2^th day of April,1951 ATTEST: City Clerk MAYO'R