Loading...
324i u RESOLUTION No.324 A RESOLUTION ADOPTING THE SIX-YEAR STREET PROGRAM 1964-1969 FOR THE CITY OF MOSES LAKE,WASHINGTON WHEREAS,the office of the City Engineer of the City of Moses Lake has caused to be prepared a program for street improvements in the City of Moses Lake for the six-year period from 1964 to 1969 inclusive,in accordance with the provisions of RCW 35.77.010,and WHEREAS,the City Council of the City of Moses Lake has held a public hearing on the six year street program as required by RCW 35 .77.010,and WHEREAS it is the desire of the City Council of the City of Moses Lake to adopt the six year street program 1964-1969 NOW,THEREFORE,BE IT RESOLVED that the program entitled,"Six Year Street Program 1964-1969,"dated February 25,1964,hereto attached be,and the same is hereby adopted as the six year street program for the period of 1964 to 1969 for the City of Moses Lake,Washington. PASSED by the City Council and APPROVED by its Mayor this 15th day of April,1964. ATTEST: APPROVED AS TO FORM: (D*1y Attorney ^•-y* City of Moses Lake Six Year Street Program 1964-1969 1964 STREET FUND PROTECTS 1.MARINA DRIVE RAILROAD CROSSING Description:Obtain right-of-way and construct gravel crossing. Estimate:$2,500 2 .SEALCOATING GARDEN HEIGHTS AND MONTLAKE AREAS Description:Continuation of sealcoating program.Includes all streets in these areas which were paved prior to 1957. Estimate:$10,000 3.BROADWAY (Highway 171)IMPROVEMENTS Description:Construction of sidewalks and driveways on Broadway from Holly Street to Lee Street.Work to be done on Highway Department contract Estimate LID 40%$12,000 Street Funds 18,000 Totals $30,000 1964 ARTERIAL STREET FUND PROTECTS 1.HILL AVENUE -SEALCOATING Description:Sealcoating of Hill Avenue from Division Street to Pioneer Way Estimate:2<r Gas Tax Funds $2,250 Street Matching Funds 750 Total $3,000 2.ALDER STREET RAILROAD CROSSING SIGNALS Description:Reimbursement of Chicago,Milwaukee,St.Paul and Pacific Railroad for City's share in new signal. Includes tie-in with existing traffic signal at Broadway and Alder. Estimate:a£Gas Tax Funds $4,500 Street Matching Funds 1,500 Total (City Share)$6,000 3.NELSON ROAD -HIGHWAY 17 INTERSECTION Description:Widening the intersection and installing street lights and paving the approaches to the intersection of Nelson Road and Highway 17.This is a joint project with the City,County and State Highway Departments.City's share based on traffic volumes on Nelson Road inside city limits is approximately 15% Estimate:i£Gas Tax Funds $1,500 Street Matchine Funds 500 Total (City Share)$2 ,000 4.LAKESHORE DRIVE -PENINSULA DRIVE SEALCOATING Description: Estimate: Expansion of 1963 program to sealcoat bituminous surface treatment streets in sparsely settled areas This will complete the Lower Peninsula area. 2<r Gas Tax Funds Street Matchine Funds Total $3,375 1,125 $4,500 5 .PIONEER WAY -WHEELER ROAD TRAFFIC SIGNAL Description: Estimate: Completion of the current project of signal install ation at this intersection. i<r Gas Tax Funds Street Matching Funds Total $9,000 3,000 $12,000 1965 STREET FUND PROTECTS 1.PENINSULA AREA SEALCOATING Description: Estimate: Completion of first phase of sealcoating paved streets.Most streets paved prior to 1957 will have been sealcoated.Tentatively streets are programmed for sealcoating 10 years from the original improvement $7,600 1965 ARTERIAL STREET FUND PROTECTS 1.STRATFORD ROAD -VALLEY ROAD TO HIGHWAY 17 Description: Estimate: Paving four lanes,curbs and sidewalks in conjunction with Highway Department improve ment of Highway 17 (SSh 11-G)at Stratford Road LID (40%)$24,000 H Gas Tax Funds 31,500 Street Matching Funds 4,500 Total $60,000 2 .PENINSULA DRIVE -SEALCOAT Description:Sealcoating of Peninsula Drive from Poplar to Marigold. Paged 1956 Estimate:5^Gas Tax Funds Street Matchine Funds $750 250 1,000 3.WESTERN AVENUE -RIGHT-OF-WAY ACQUISITION Description: Estimate: Beginning of program to acquire right-of-way for second lake crossing in the Peninsula area before industry develops and cuts off the access 4$Gas Tax Funds Street Matching Funds $ 7,500 2,500 $10,000 4.PIONEER WAY PAVING -Part One -Proposed General Obligation Bond Issue Description: Estimate: Widen Pioneer Way to 4 lanes with parking,curbs and 12 ft.sidewalks from Broadway and Chestnut to Olive Ave.(60%LID)and widen to 4 lanes,no parking,curbs,and 5 ft.sidewalks from Olive Ave. to Highway 17 (40%LID). LID H Gas Tax Funds Street Matching Funds $132,800 127,125* 18,075 $278,000 WHEELER ROAD PAVING -Part Two -Proposed General Obligation Bond Issue Description:Widen Wheeler Road from Pioneer Way to Highway 17 to four lanes,no parking,curbs and sidewalk Estimate:LID (40%) 4<r Gas Tax Fund Street Matching Funds Total $ 52,400 75,750* 2,850 $131,000 *The amounts listed under i$Gas Tax Funds above will be obtained from a General Obligation Bond Issue which would be redeemed by a portion of the principal amount of approximately $205,000. 1966 -1969 STREET FUND PROTECTS 1.BROADWAY -LEE STREET to 1-90 Description:Extension of sidewalks,pavement and curbs to Interstate 90.Paving,storm drainage,and curbs would again be built by the Highway Department. Sidewalks will be our responsibility. Estimate:LID (40%) Street Funds Total $ 14,400 21,600 $ 36,000 Note:This is the only large access street need forseeable at this time. As this plan is revised in 1965,the program can be more accurately projected for the period of 1966-1969 . 1966 -1969 ARTERIAL STREET FUND PROTECTS 1.WESTERN AVENUE -Right-of-way acquisition Description:Continuation of 1965 program to obtain right-of-way for the second lake crossing in the Peninsula area. Estimate:i£Gas Tax Funds Street Matching Funds $ 15,000 5,000 $ 20,000 u 1 u 2 .PIONEER WAY -THIRD AVENUE TRAFFIC SIGNAL Description:Traffic volumes at this intersection a year or two ago would possibly have justified a traffic signal. This estimate is for signal only.Physical channel ization would very likely not be necessary. Estimate:4£Gas Tax Funds $7,500 Street Matching Funds 2,500 $10,000 3.WHEELER ROAD -HIGHWAY 17 (SSH 11-G)TRAFFIC SIGNAL Description:When the Highway Department recommends the installation of a traffic signal at this intersection, the city will have to bear a portion of the cost. Probably 50%or more. Estimate:4<r Gas Tax Fund $4,500 Street Matching Funds 1,500 Total (City share)$6,000 RE-CAP OF STREET AND ARTERIAL STREET PROJECTS -1964 -1969 I.1964 Project 4£Gas Tax Street LID Total Marina Drive RR crossing -0-2,500 -0-2,500 I Garden Heights & Mont- lake sealcoating -0-10,000 -0-10,000 Broadway -Holly to Lee sidewalks -0-18,000 12,000 30,000 Hill Ave.Sealcoating 2,250 750 -0-3,000 Alder St.RR signals 4,500 1,500 -0-6,000 Nelson Rd.Highway 17 Intersection 1,500 500 -0-2,000 Lakeshore Dr.and Peninsula Dr.sealcoating 3,375 1,125 -0-4,500 Pioneer Way,Wheeler Rd. Traffic signal 9,000 3,000 -0-12,000 Totals $20,625 37,375 12,000 70,000 RE-CAP OF STREET AND ARTERIAL STREET PROTECTS -1964-1969 II.1965 Project 4£Gas Tax Street Peninsula Area sealcoating -0- Stratford Road widening 31,500 Peninsula Dr.sealcoat 750 Western Ave.right-of-way 7,500 Street LID Total 7,600 -0-7,600 4,500 24,000 60,000 250 -0-1,000 2,500 -0-10,000 Pioneer Way plus Wheeler Road widening (Bond Issue project)202,875 Totals $242,625 20,925 185,200 409,000 35,775 209,200 487,600 RE-CAP OF STREET AND ARTERIAL STREET PROTECTS -1964-1969 III.1966 -1969 4^Gas Tax Street LIDProject Total Broadway -Lee to 1-90 -0-21,600 14,400 36,000 Western Ave.right-of- way 15,000 5,000 -0-20,000 Pioneer Way-Third Ave. Traffic signal 7,500 2,500 -0-10,000 Wheeler Rd.-Highway 17 Traffic signal 4,500 1,500 -0-6,000 Totals $27,000 30,000 14,400 72,000 n n LOCAL IMPROVEMENT DISTRICT PROTECTS I.1964 Broadway Sidewalks $12,000 Total II.1965 Straford Road Pioneer Way Wheeler Road Total III.1966 -1969 Penn,Fifth,Fig,Block "D"Street,Columbia,Lakeside Peninsula Dr.Locust,Apruce, Sycamore,Barbara Murphy,Bruce,Kristine,Charlotte, Market,Buell Nelson Road Pine,Northshore,Knolls Vista Total GRAND TOTAL STREET FUND RE-CAP $24,000 132,800 52,400 $85,000 75,000 140,000 105,000 32,500 22,500 $12,000 $209,200 $460,000 $681,200 YEAR 1963 1964 1965 1966 1967 1968 1969 PROJECT NEEDS BUDGET NEEDS BALANCE 18,000 44,125 8,350 -0- -0- -0- -0- 37,375 35,775 26,600 4,000 -0- -0- ARTERIAL STREET FUND RE-CAP YEAR 1963 1964 1965 1966 1967 1968 1969 INCOME 34,500 34,500 34,500 34,500 34,500 34,500 63,500 -0- 18,250 4,000 -0- -0- PROJECT NEEDS 20,625 39,750 22,500 30,400* 25,900* 25,900* ♦Includes General Obligation Bond payments for Pioneer Way and Wheeler Road improvements.Annual payment $25,900. BALANCE 45,750 59,625 54,375 66,375 70,475 79,075 87,675